All data center projects
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
-
Wonder Valley Off-Grid AI Data Center Park — 7.5 GW, Grande Prairie, Canada (O'Leary Ventures) · announced
-
Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States (Nexus) · under construction
-
Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States (Meta) · under construction
-
G42 “Stargate” UAE–US AI Campus (Abu Dhabi) — 5.0 GW, Abu Dhabi, United Arab Emirates (G42) · under construction
-
OpenAI–G42 Abu Dhabi AI Megacluster — 5.0 GW, Abu Dhabi, United Arab Emirates (OpenAI) · announced
-
Scala — AI City (Eldorado do Sul) — 4.8 GW, Eldorado do Sul, Brazil (Scala Data Centers) · operational
-
Beacon AI Alberta Hyperscale Campuses — 4.5 GW, Calgary & Edmonton Areas, Canada (Beacon AI Centers) · announced
-
Microsoft Fairwater Wisconsin — 3.3 GW, Mount Pleasant, WI, United States (Microsoft) · operational
-
Stock Farm Road 3 GW AI Data Center (South Korea) — 3.0 GW, Muan County (planned), South Korea (Stock Farm Road) · announced
-
Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States (Google) · announced
-
AWS Project Rainier (New Carlisle, Indiana) — 2.4 GW, New Carlisle, IN, United States (Amazon Web Services) · operational
-
Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States (Meta) · operational
-
Diablo Canyon AI Integration Project — 2.3 GW, Avila Beach, United States (Pacific Gas and Electric Company (PG&E)) · operational
-
OpenAI Stargate New Mexico — 2.2 GW, NM, United States (Oracle) · under construction
-
Project Rainier — 2.2 GW, New Carlisle, IN, United States (AWS) · operational
-
Meta–Vistra Nuclear Uprate Agreement (OH/PA) — 2.1 GW, Perry, OH, United States (Meta) · announced
-
OpenAI Stargate Shackelford — 2.0 GW, Abilene, TX, United States (Oracle) · operational
-
Digital Realty — Project Bunkhouse — 1.8 GW, Stilesboro, GA, United States (Digital Realty) · announced
-
AWS Pennsylvania Campus — 1.8 GW, Salem Township, PA, United States (AWS) · under construction
-
AWS AI Innovation Campuses (Salem and Falls Townships, PA) — 1.8 GW, Salem Township, PA, United States (Amazon Web Services) · under construction
-
Calvert Cliffs Relicense — 1.8 GW, Lusby, MD, United States (Constellation) · operational
-
QTS Cedar Rapids — 1.6 GW, Fairfax, IA, United States · operational
-
Elea — Rio AI City — 1.5 GW, Rio de Janeiro, Brazil (Elea Data Centers) · under construction
-
ExxonMobil's 1.5GW Data Center Power Plant Initiative — 1.5 GW, Houston, United States (ExxonMobil) · announced
-
NEOM Oxagon — AI Data Center Campus — 1.5 GW, Oxagon, Saudi Arabia (NEOM & DataVolt) · announced
-
NEOM Oxagon Net-Zero AI Data Center (Saudi Arabia) — 1.5 GW, Oxagon, Saudi Arabia (DataVolt) · announced
-
Romania — Black Sea AI Gigafactory — 1.5 GW, Cernavodă, Romania (EU EuroHPC & Romanian Consortium) · announced
-
Colossus 2 — 1.5 GW, Memphis, TN, United States (SpaceXAI) · operational
-
xAI Colossus 2 — 1.5 GW, Memphis, TN, United States (xAI) · operational
-
Frontier Campus — 1.4 GW, TX, United States (Vantage) · under construction
-
OpenAI Stargate UAE — 1.4 GW, United Arab Emirates (G42) · operational
-
MGX/Mistral AI Campus (Paris Region) — 1.4 GW, Paris, France (MGX) · announced
-
OpenAI Stargate Michigan — 1.4 GW, MI, United States (Oracle) · operational
-
OpenAI Stargate Wisconsin — 1.3 GW, WI, United States (Oracle) · operational
-
AWS Ohio Campus — 1.3 GW, Jefferson Township, OH, United States (AWS) · announced
-
Anthropic-Amazon New Carlisle — 1.2 GW, New Carlisle, IN, United States (Amazon) · operational
-
OpenAI Stargate Milam — 1.2 GW, TX, United States (Softbank) · operational
-
Stargate I — 1.2 GW, Abilene, TX, United States (Crusoe) · under construction
-
Vistra's Comanche Peak Nuclear Data Center Campus — 1.2 GW, Glen Rose, United States (Vistra Corp) · announced
-
OpenAI Stargate Abilene — 1.2 GW, Abilene, TX, United States (Oracle) · operational
-
Meta Prometheus — 1.1 GW, New Albany, OH, United States (Meta) · operational
-
Goodnight — 1.1 GW, Claude, TX, United States (Google) · operational
-
Google Fort Wayne — 1.0 GW, Fort Wayne, IN, United States (Google) · under construction
-
Amazon Ridgeland — 1.0 GW, Mississippi, MS, United States (Amazon) · operational
-
Goodnight Campus — 1.0 GW, Claude, TX, United States (Crusoe) · under construction
-
Project Domino — 1.0 GW, Lebanon, IN, United States (Meta) · announced
-
El Paso DC — 1.0 GW, El Paso, TX, United States (Meta) · operational
-
Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs, IA, United States (Google) · operational
-
Azure Northern Virginia — 1.0 GW, Northern Virginia, VA, United States (Microsoft) · operational
-
Project Jupiter (NM) — 1.0 GW, New Mexico, NM, United States (Microsoft) · announced
-
AWS North Carolina Campus — 1.0 GW, Richmond County, NC, United States (AWS) · under construction
-
Adani & Google — Visakhapatnam AI Campus — 1.0 GW, Visakhapatnam, India (AdaniConneX & Google Cloud) · announced
-
SK Group–AWS Ulsan AI Data Center (South Korea) — 1.0 GW, Ulsan, South Korea (SK Group) · announced
-
Microsoft — Australia AI Expansion — 1.0 GW, Sydney, Melbourne, Canberra, Australia (Microsoft) · operational
-
Galaxy Data Center — Rayong 1GW AI Hub — 1.0 GW, Rayong, Thailand (Hoyinn Technologies) · announced
-
AWS — Aragón AI Mega Campus — 1.0 GW, Zaragoza, Spain (Amazon Web Services) · announced
-
Data Center Valley — Ekibastuz — 1.0 GW, Ekibastuz, Kazakhstan (Kazakhstan Ministry of AI and Digital Development) · under construction
-
Amazon's Nuclear-Powered Data Center Acquisition — 960 MW, Berwick, United States (Amazon Web Services) · operational
-
Crusoe Abilene Expansion — 941 MW, Abilene, TX, United States (Microsoft) · operational
-
QTS Richmond — 921 MW, Sandston, VA, United States · operational
-
Atlas Development — Project Sail — 900 MW, Coweta County, GA, United States (Atlas Development & Prologis) · announced
-
CloudHQ — Querétaro AI Mega Campus — 900 MW, Querétaro, Mexico (CloudHQ) · under construction
-
Microsoft Fairwater Atlanta — 859 MW, Fayetteville, GA, United States (Microsoft) · operational
-
Three Mile Island Restart — 837 MW, Middletown, PA, United States (Constellation) · under construction
-
Crane Clean Energy Center (Three Mile Island Reactivation) — 835 MW, Middletown, United States (Constellation Energy) · announced
-
Amazon Madison Mega Site — 819 MW, Amazon Data Services Inc, MS, United States (Amazon) · operational
-
Coreweave Helios — 800 MW, Afton, TX, United States (Coreweave) · operational
-
Wilbarger Campus — 800 MW, Vernon, TX, United States (Google) · announced
-
Kansas City AI Campus — 800 MW, Independence, MO, United States (Nebius) · announced
-
Meta AI Training Campus (Cortland, Illinois) — 800 MW, Cortland, IL, United States (Meta) · under construction
-
Oracle AI Cloud Infrastructure (US) — 800 MW, Hillsboro, IL, United States (Oracle) · operational
-
AWS Northern Virginia — 770 MW, Loudoun County, VA, United States (AWS) · under construction
-
AWS Mississippi Campus — 650 MW, Canton, MS, United States (AWS) · under construction
-
Google Cedar Rapids — 627 MW, IA 52404, IA, United States (Google) · operational
-
NextEra Energy's Duane Arnold Nuclear Plant Reactivation — 615 MW, Palo, United States (NextEra Energy) · announced
-
Sweetwater Campus — 600 MW, Sweetwater, TX, United States (IREN) · under construction
-
Microsoft — Lordstown AI Campus (Stargate Phase 1) — 600 MW, Lordstown, OH, United States (Microsoft) · announced
-
Microsoft — India AI Infrastructure (Hyderabad / Pune) — 600 MW, Hyderabad, India (Microsoft) · under construction
-
Amazon Web Services — EU-CENTRAL-1 Frankfurt Region — 600 MW, Frankfurt, Germany (Amazon Web Services) · operational
-
Baidu AI Cloud — Yanqi Lake Data Center — 600 MW, Yanqing, China (Baidu) · operational
-
ByteDance Volcengine — Inner Mongolia AI Training Cluster — 600 MW, Hohhot, China (ByteDance) · operational
-
AWS Oregon Expansion — 576 MW, Boardman, OR, United States (AWS) · under construction
-
Google New Albany — 543 MW, New Albany, OH, United States (Google) · operational
-
Fluidstack Lake Mariner — 509 MW, Barker, NY, United States (Fluidstack) · operational
-
Stream NY Campus — 500 MW, NY, United States (Stream DC) · under construction
-
CoreWeave AI Data Centers (US) — 500 MW, Livingston, United States (CoreWeave) · operational
-
Google-Kairos Power AI Data Center Initiative — 500 MW, Oak Ridge, United States (Google) · announced
-
Tesla Dojo Supercomputer — Buffalo New York — 500 MW, Buffalo, NY, United States (Tesla) · operational
-
Amazon Web Services — AP-NORTHEAST-1 Tokyo Region — 500 MW, Tokyo, Japan (Amazon Web Services) · operational
-
Microsoft Azure — UK South Region (London) — 500 MW, London, United Kingdom (Microsoft) · operational
-
Aramco Digital & Groq Inference Data Center (Saudi Arabia) — 500 MW, Riyadh, Saudi Arabia (Aramco Digital) · announced
-
Bell AI Fabric Data Center Network (British Columbia) — 500 MW, Kamloops & Merritt, Canada (Bell Canada (BCE)) · under construction
-
Alibaba Cloud — Zhangbei Super Data Center — 500 MW, Zhangbei, China (Alibaba Cloud) · operational
-
ByteDance — Johor AI Data Center — 500 MW, Kulai, Malaysia (ByteDance (TikTok)) · under construction
-
Oracle — Malaysia Public Cloud Region — 500 MW, Kuala Lumpur, Malaysia (Oracle) · announced
-
Microsoft — São Paulo AI Infrastructure (Expansion) — 500 MW, São Paulo, Brazil (Microsoft) · operational
-
Digital Edge — CGK AI Mega Campus — 500 MW, Bekasi, Indonesia (Digital Edge) · under construction
-
Microsoft — Sweden Central AI Infrastructure — 500 MW, Gävle, Sweden (Microsoft) · operational
-
Naver & NVIDIA Morocco AI Data Center (Tamesna) — 500 MW, Tamesna, Morocco (Naver) · announced
-
Microsoft Azure — Poland Central (Warsaw) — 500 MW, Warsaw, Poland (Microsoft) · operational
-
STACK Infrastructure NVA02 — 487 MW, Manassas, VA, United States · operational
-
Google Omaha — 474 MW, Omaha, NE, United States (Google) · operational
-
Google Columbus — 464 MW, Columbus, OH, United States (Google) · operational
-
Amazon Web Services — EU-WEST-1 Dublin Region — 450 MW, Dublin, Ireland (Amazon Web Services) · operational
-
Haskell County Campus — 440 MW, TX, United States (Google) · announced
-
Colossus 1 — 425 MW, Memphis, TN, United States (SpaceXAI) · announced
-
xAI Colossus 1 — 425 MW, Memphis, TN, United States (xAI) · operational
-
Amazon Web Services — AP-SOUTH-1 Mumbai Region — 400 MW, Mumbai, India (Amazon Web Services) · operational
-
Huawei Cloud — Guizhou AI Data Center — 400 MW, Guiyang, China (Huawei Cloud) · operational
-
ByteDance — Thailand AI Data Hub — 400 MW, Bangkok, Thailand (ByteDance) · under construction
-
Google — Eemshaven AI Data Center — 400 MW, Eemshaven, Netherlands (Google) · operational
-
Google Storey County — 389 MW, United States (Google) · operational
-
CoreWeave Denton TX — 367 MW, Denton, TX, United States (CoreWeave) · operational
-
AirTrunk — MEL2 Melbourne — 354 MW, Melbourne, Australia (AirTrunk) · announced
-
Google — Berkeley County Data Center Campus — 350 MW, Moncks Corner, SC, United States (Google) · operational
-
Amazon Web Services — AP-SOUTHEAST-1 Singapore Region — 350 MW, Singapore, Singapore (Amazon Web Services) · operational
-
Lappeenranta AI Factory — 310 MW, Lappeenranta, Finland, Finland (Nebius) · under construction
-
Lancaster County DC — 300 MW, Lancaster County, PA, United States (CoreWeave) · under construction
-
Childress Campus — 300 MW, Childress, TX, United States (IREN) · under construction
-
New Jersey AI Campus — 300 MW, NJ, United States (Nebius) · announced
-
Ashburn Campus — 300 MW, Ashburn, VA, United States (Digital Realty) · under construction
-
Microsoft — San Antonio, Texas AI Data Center Campus — 300 MW, San Antonio, TX, United States (Microsoft) · operational
-
AirTrunk — TOK1 AI Expansion (Tokyo) — 300 MW, Inzai, Japan (AirTrunk) · under construction
-
SoftBank Tomakomai AI Data Center (Japan) — 300 MW, Tomakomai, Japan (SoftBank Corp.) · under construction
-
Digital Realty UK AI Mega-Campus — 300 MW, Slough, United Kingdom (Digital Realty) · announced
-
Tencent Tianjin AI Data Center (China) — 300 MW, Tianjin, China (Tencent Holdings) · operational
-
AWS — Malaysia Cloud Region (Cyberjaya) — 300 MW, Cyberjaya, Malaysia (Amazon Web Services) · operational
-
Google — Changhua AI Data Center — 300 MW, Changhua City, Taiwan (Google) · operational
-
Bulk Data Centers — N01 AI Campus — 300 MW, Kristiansand, Norway (Bulk Data Centers) · under construction
-
Meta — Luleå, Sweden AI Data Center Campus — 300 MW, Luleå, Sweden (Meta) · operational
-
Microsoft Azure — Netherlands Region (Amsterdam) — 300 MW, Amsterdam, Netherlands (Microsoft) · operational
-
Meta — Odense AI-Ready Data Center — 300 MW, Odense, Denmark (Meta) · operational
-
Google — Saint-Ghislain, Belgium AI Data Center Campus — 300 MW, Saint-Ghislain, Belgium (Google) · operational
-
Meta — Clonee AI Data Center Campus — 288 MW, Clonee, Ireland (Meta) · operational
-
Google Council Bluffs (East) — 284 MW, Council Bluffs, IA, United States (Google) · operational
-
Start Campus Sines Data Campus — 280 MW, Start Campus - Sustainable Data Center Services, Portugal (Nscale) · operational
-
Datagrid — 'AI Factory' (Southland) — 280 MW, Invercargill, New Zealand (Datagrid New Zealand) · announced
-
Stream Phoenix — 267 MW, AZ, United States · operational
-
Microsoft Goodyear — 263 MW, Goodyear, AZ, United States (Microsoft) · operational
-
Amazon Web Services — Seoul Region (AP Northeast 2) — 250 MW, Seoul, South Korea (Amazon Web Services) · operational
-
NTT DATA — Singapore Hyperscale AI Campus — 250 MW, Singapore, Singapore (NTT DATA) · operational
-
AWS — Indonesia Cloud Region (Jakarta) — 250 MW, Jakarta, Indonesia (Amazon Web Services) · operational
-
EcoDataCenter — Borlänge AI Mega Campus — 250 MW, Borlänge, Sweden (EcoDataCenter) · under construction
-
DAMAC — Laguna AI Data Center — 250 MW, Biñan, Philippines (DAMAC Digital) · announced
-
Lille AI Factory — 240 MW, Lille, France, France (Nebius) · under construction
-
Google — Skien AI Campus — 240 MW, Skien, Norway (Google) · under construction
-
Meta Temple — 238 MW, Temple, TX, United States (Meta) · operational
-
Stargate Norway — Narvik AI Gigafactory — 230 MW, Narvik, Norway (OpenAI, Nscale & Aker) · under construction
-
Microsoft Project Osmium — 228 MW, Cumming, IA, United States (Microsoft) · operational
-
Vantage Nevada AI Data Center (NV1) — 224 MW, Henderson, NV, United States (Vantage Data Centers) · under construction
-
True Internet DC — Thailand AI Campus — 223 MW, Chonburi, Thailand (True Internet Data Center) · announced
-
Google Cloud Malaysia AI Data Center (Johor Bahru) — 220 MW, Johor Bahru, Malaysia (Google) · under construction
-
DC BLOX — Conyers AI Campus — 216 MW, Conyers, GA, United States (DC BLOX) · under construction
-
Alibaba Zhangbei — 203 MW, Zhangbei, China (Alibaba) · under construction
-
Garland Campus — 200 MW, Dallas, TX, United States (Digital Realty) · under construction
-
Apple Private Cloud Compute — AI Inference Infrastructure — 200 MW, Maiden, AZ, United States (Apple) · operational
-
Vantage Data Centers — US West AI Campus (Santa Clara/Phoenix) — 200 MW, Santa Clara, CA, United States (Vantage Data Centers) · operational
-
Scaleway — AION 'AI Gigafactory' — 200 MW, Montereau-Fault-Yonne, France (Scaleway (Iliad Group)) · announced
-
Microsoft Azure — UAE North (Dubai) — 200 MW, Dubai, United Arab Emirates (Microsoft) · operational
-
Microsoft Taiwan North AI Cloud Region — 200 MW, Taipei, Taiwan (Microsoft) · announced
-
Google — Hamina, Finland AI Data Center Campus — 200 MW, Hamina, Finland (Google) · operational
-
Google & Turkcell — Turkey Hyperscale AI Campus — 200 MW, Istanbul, Turkey (Google Cloud & Turkcell) · announced
-
SGI-HCM AI Data Center Campus — 200 MW, Ho Chi Minh City, Vietnam (Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC)) · announced
-
Google — Fredericia (Taulov) AI Data Center — 200 MW, Fredericia, Denmark (Google) · operational
-
Meta Kuna — 198 MW, Kuna ID 83634, ID, United States (Meta) · operational
-
Microsoft — Kemps Creek AI Campus (Sydney) — 190 MW, Sydney, Australia (Microsoft) · under construction
-
Hammond DC — 180 MW, Hammond, IN, United States (CoreWeave) · under construction
-
SINES 4.0 — SIN02 AI Gigafactory — 180 MW, Sines, Portugal (Start Campus) · under construction
-
Vantage TX1 — 179 MW, Goodyear, AZ, United States · under construction
-
Vantage Data Centers Quebec Expansion (Montreal & Quebec City) — 178 MW, Montreal, Canada (Vantage Data Centers) · operational
-
NEXTDC — M4 Melbourne 'AI Factory' — 160 MW, Melbourne, Australia (NEXTDC) · under construction
-
Hillsboro Campus — 150 MW, Hillsboro, OR, United States (Digital Realty) · under construction
-
Amazon Web Services — India Expansion (Rajasthan AI Campus) — 150 MW, Jaipur, India (Amazon Web Services) · announced
-
Hetzner — Falkenstein Data Center Park — 150 MW, Falkenstein/Vogtland, Germany (Hetzner Online GmbH) · operational
-
Hetzner — Nuremberg Data Center Park — 150 MW, Nuremberg, Germany (Hetzner Online GmbH) · operational
-
Amazon Web Services — Osaka Region (AP Northeast 3) — 150 MW, Osaka, Japan (Amazon Web Services) · operational
-
SoftBank — Sakai AI Data Center — 150 MW, Sakai, Japan (SoftBank) · under construction
-
ODATA — QR03 Querétaro AI Campus — 150 MW, El Marqués, Mexico (ODATA (Aligned Data Centers)) · under construction
-
Amazon Web Services — EU-NORTH-1 Stockholm Region — 150 MW, Stockholm, Sweden (Amazon Web Services) · operational
-
Microsoft Azure — Italy North Region (Milan) — 150 MW, Milan, Italy (Microsoft) · operational
-
Yandex Cloud — AI Training Data Centers — 150 MW, Mäntyselkä (Moscow region), Russia (Yandex) · operational
-
AWS — Europe (Zurich) eu-central-2 — 150 MW, Zurich, Switzerland (Amazon) · operational
-
Viettel — Tan Phu Trung AI Data Center — 140 MW, Ho Chi Minh City, Vietnam (Viettel Group) · under construction
-
Google Kansas City East — 126 MW, United States (Google) · operational
-
Reliance Jio — Jamnagar AI Mega Campus — 120 MW, Jamnagar, India (Reliance Industries (Jio)) · announced
-
Polarise — Amberg AI Data Center — 120 MW, Amberg, Germany (Polarise) · announced
-
AWS — Africa (Cape Town) af-south-1 — 120 MW, Cape Town, South Africa (Amazon) · operational
-
Magnora — Hämeenlinna AI Data Center — 120 MW, Hämeenlinna, Finland (Magnora & NEEG) · announced
-
ODATA — BG03 Bogotá AI Campus — 120 MW, Bogotá, Colombia (ODATA (Aligned Data Centers)) · under construction
-
Microsoft Azure — Austria (Vienna) AI Region — 120 MW, Vienna, Austria (Microsoft) · operational
-
Equinix SV18 Silicon Valley (California) — 117 MW, San Jose, United States (Equinix) · announced
-
Microsoft — Markham AI Megaproject — 112 MW, Markham, Canada (Microsoft) · under construction
-
Ellendale Phase 1 — 100 MW, Ellendale, ND, United States (CoreWeave) · operational
-
IBM — Watson AI Data Centers (US) — 100 MW, Raleigh, GA, United States (IBM) · operational
-
Naver — Chuncheon Data Center (Gak) — 100 MW, Chuncheon, South Korea (Naver) · operational
-
Khazna QAJ1 — Ajman AI Data Center — 100 MW, Ajman, United Arab Emirates (Khazna Data Centers) · under construction
-
Microsoft Azure — Saudi Arabia East (Dammam) — 100 MW, Dammam, Saudi Arabia (Microsoft) · announced
-
DeepSeek — AI Training Cluster — 100 MW, Hangzhou, China (DeepSeek) · operational
-
Microsoft Azure — Spain Region (Madrid) — 100 MW, Madrid, Spain (Microsoft) · operational
-
Nvidia & Foxconn — Kaohsiung AI Factory — 100 MW, Kaohsiung, Taiwan (Foxconn (Hon Hai Technology Group) & NVIDIA) · under construction
-
NEBIUS AI Cloud — Mäntsälä Finland Data Center — 100 MW, Mäntsälä, Finland (Nebius) · operational
-
AWS — Asia Pacific (New Zealand) Region — 100 MW, Auckland, New Zealand (Amazon Web Services) · operational
-
Khazna Ankara — Başkent AI Data Center — 100 MW, Ankara, Turkey (Khazna Data Centers (G42)) · announced
-
Asprofin Bank — Qatar Hyperscale AI Data Center — 100 MW, Doha, Qatar (Asprofin Bank Corporation) · announced
-
Qai & Brookfield — Qatar AI Compute Center — 100 MW, Doha, Qatar (Qai (QIA) & Brookfield Asset Management) · announced
-
AWS — Middle East South (Cairo) me-south-2 — 100 MW, Cairo, Egypt (Amazon) · announced
-
AWS — Santiago AI Region — 100 MW, Santiago, Chile (Amazon Web Services) · announced
-
ePLDT VITRO — General Trias AI Campus — 100 MW, General Trias, Philippines (ePLDT / VITRO Inc.) · announced
-
AWS — Hong Kong Cloud Region (AI Expansion) — 100 MW, Hong Kong, Hong Kong (Amazon Web Services) · operational
-
Microsoft Azure — Romania (Bucharest) — 100 MW, Bucharest, Romania (Microsoft) · announced
-
Ethiopia — National AI Factory — 100 MW, Addis Ababa, Ethiopia (Ethiopian AI Institute & International Investors) · announced
-
Firebird AI Data Center (Armenia) — 100 MW, Yerevan, Armenia (Firebird) · announced
-
Microsoft & G42's Olkaria Geothermal Data Center (Kenya) — 100 MW, Naivasha, Kenya (Microsoft) · announced
-
Khazna Ajman AI Data Center (UAE) — 100 MW, Ajman, United Arab Emirates (Khazna Data Centers) · under construction
-
Oracle Batam — 94 MW, Indonesia (Oracle) · under construction
-
eStruxture's CAL-3 Hyperscale Data Center (Calgary) — 90 MW, Balzac, Canada (eStruxture Data Centres) · under construction
-
Waymo / Google — Autonomous Driving AI Training Cluster — 80 MW, Mountain View, CA, United States (Google) · operational
-
Kakao — KakaoCloud AI Data Center — 80 MW, Ansan, South Korea (Kakao) · operational
-
Tencent Cloud — Southeast Asia AI Region (Singapore) — 80 MW, Singapore, Singapore (Tencent) · operational
-
Amazon Web Services — Canada West Region (Calgary) — 80 MW, Calgary, Canada (Amazon Web Services) · operational
-
Microsoft Azure — South Africa AI Region — 80 MW, Johannesburg, South Africa (Microsoft) · operational
-
Nebius & Mega Or — Israel AI Hub — 80 MW, Beit Shemesh, Israel (Nebius & Mega Or) · under construction
-
Microsoft Azure — Colombia (Bogotá) — 80 MW, Bogotá, Colombia (Microsoft) · operational
-
Microsoft Azure — Portugal Region (Lisbon) — 80 MW, Lisbon, Portugal (Microsoft) · operational
-
atNorth ICE02 AI Data Center — 80 MW, Keflavík, Iceland (atNorth) · operational
-
Mantsala AI Factory — 75 MW, Mantsala, Finland, Finland (Nebius) · operational
-
PA10x Paris — 62 MW, Paris, France, France (Equinix) · under construction
-
Aurora Supercomputer — Argonne National Laboratory — 60 MW, Lemont, IL, United States (Argonne National Laboratory) · operational
-
Yotta — D2 AI Supercluster (Greater Noida) — 60 MW, Greater Noida, India (Yotta Data Services) · under construction
-
Amazon Web Services — Israel Region (il-central-1, Tel Aviv) — 60 MW, Tel Aviv, Israel (Amazon Web Services) · operational
-
Google Cloud — Philippines (Manila) — 60 MW, Manila, Philippines (Google) · operational
-
Amazon Web Services — Bahrain Middle East Region (me-south-1) — 60 MW, Manama, Bahrain (Amazon Web Services) · operational
-
Oracle Cloud — Greece (Athens) — 60 MW, Athens, Greece (Oracle) · operational
-
Microsoft — Inflection AI Pi Infrastructure (Midwest) — 50 MW, Chicago, United States (Microsoft) · operational
-
Oklo's Aurora Nuclear Powerhouse for AI Data Centers — 50 MW, Arco, United States (Oklo Inc.) · announced
-
Singtel & NVIDIA — Singapore AI Hub — 50 MW, Singapore, Singapore (Singtel & NVIDIA) · operational
-
Green Mountain AI Data Center (Rjukan) — 50 MW, Rjukan, Norway (Green Mountain AS) · operational
-
TikTok / ByteDance — Project Clover EU Data Center (Norway) — 50 MW, Hamar, Norway (ByteDance) · under construction
-
Microsoft Azure — Nigeria Region (Lagos, Announced) — 50 MW, Lagos, Nigeria (Microsoft) · announced
-
Microsoft Azure — Vietnam (Hanoi / Ho Chi Minh City) — 50 MW, Hanoi, Vietnam (Microsoft) · announced
-
Microsoft — Chile Central AI Infrastructure — 50 MW, Santiago, Chile (Microsoft) · operational
-
Microsoft — Azure AI Region (Kuwait) — 50 MW, Kuwait City, Kuwait (Microsoft) · announced
-
Sberbank — Balakovo AI Data Center — 50 MW, Balakovo, Russia (Sberbank (Sber)) · under construction
-
Cyberport AI Supercomputing Centre (AISC) — Hong Kong — 50 MW, Cyberport, Hong Kong (Cyberport) · operational
-
Microsoft — Argentina AI Cloud Region — 50 MW, Buenos Aires, Argentina (Microsoft) · announced
-
Microsoft Azure — Czech Republic Region (Prague) — 50 MW, Prague, Czech Republic (Microsoft) · announced
-
El Capitan Supercomputer — Lawrence Livermore National Laboratory — 40 MW, Livermore, CA, United States (Lawrence Livermore National Laboratory) · operational
-
Equinix DA12 Dallas (Texas) — 40 MW, Dallas, United States (Equinix) · under construction
-
Naver — B200 4K AI Cluster — 40 MW, Sejong, South Korea (Naver Cloud) · operational
-
Scaleway — H100 AI Cloud Data Center (France) — 40 MW, Vitry-sur-Seine, France (Scaleway) · operational
-
NVIDIA AI Factory — Helsinki, Finland — 40 MW, Helsinki, Finland (NVIDIA) · under construction
-
Yandex — Vladimir AI Data Center — 40 MW, Vladimir, Russia (Yandex) · under construction
-
Google Cloud — Argentina Region (Buenos Aires) — 40 MW, Buenos Aires, Argentina (Google) · operational
-
AWS — Peru Cloud Region (Announced) — 40 MW, Lima, Peru (Amazon Web Services) · announced
-
SV12x Silicon Valley — 36 MW, San Jose, CA, United States (Equinix) · under construction
-
KAUST — Shaheen III Supercomputer — 35 MW, Thuwal, Saudi Arabia (King Abdullah University of Science and Technology (KAUST)) · operational
-
TY15x Tokyo — 30 MW, Tokyo, Japan, Japan (Equinix) · under construction
-
SG6x Singapore — 30 MW, Singapore, Singapore (Equinix) · under construction
-
SAP AI Core — Walldorf Data Center — 30 MW, Walldorf, Germany (SAP) · operational
-
OVHcloud — Milan 3-AZ Region (MIL) — 30 MW, Milan, Italy (OVHcloud) · operational
-
Google Cloud — Kuwait Sulaibiya — 30 MW, Sulaibiya, Kuwait (Google) · announced
-
Yondr — Toronto AI Data Center — 27 MW, Toronto, Canada (Yondr Group) · under construction
-
Nebius–Mega Or National AI Data Center (Israel) — 25 MW, Modi'in, Israel (Nebius) · under construction
-
Egypt Government Data & Cloud Computing Center — 25 MW, Cairo, Egypt (Government of Egypt) · operational
-
Aleph Alpha — AI Sovereign Cloud (Germany) — 20 MW, Heidelberg, Germany (Aleph Alpha) · operational
-
UK AI Research Resource (AIRR) — Isambard-AI & Dawn Supercomputers — 20 MW, Bristol / Cambridge, United Kingdom (UK Research and Innovation (UKRI)) · operational
-
Scaleway — DC5 (PAR2) AI Hub — 20 MW, Saint-Ouen-l'Aumône, France (Scaleway) · operational
-
Microsoft — Greece AI Region (Athens) — 20 MW, Spata, Greece (Microsoft) · under construction
-
SDS “Open-Access” AI Supercomputer (Israel) — 18 MW, Petah Tikva, Israel (SDS (Shonfeld Data Services)) · operational
-
Equinix PA12x Paris (France) — 14 MW, Argenteuil, France (Equinix) · announced
-
DataVolt — Tashkent AI Data Center — 12 MW, Tashkent, Uzbekistan (DataVolt (Saudi Arabia)) · under construction
-
JUPITER Exascale AI Data Center — 10 MW, Jülich, Germany (Forschungszentrum Jülich) · operational
-
MareNostrum 5 Supercomputing Center — 10 MW, Barcelona, Spain (Barcelona Supercomputing Center) · operational
-
Ooredoo & NVIDIA — Kuwait Sovereign AI Lab — 10 MW, Kuwait City, Kuwait (Ooredoo Kuwait & NVIDIA) · operational
-
Batelco & Qareeb — Bahrain Edge AI Data Center — 10 MW, Southern Governorate, Bahrain (Batelco (Beyon) & Qareeb Data Centers) · operational
-
Oman Data Park AI Infrastructure — 10 MW, Muscat, Oman (Oman Data Park) · operational
-
Raxio — Dar es Salaam AI Data Center — 10 MW, Dar es Salaam, Tanzania (Raxio Group) · announced
-
MTN AI Data Center (Nigeria) — 9 MW, Ikeja, Nigeria (MTN Group) · under construction
-
LUMI AI Supercomputer Data Center — 7 MW, Kajaani, Finland (CSC – IT Center for Science) · operational
-
Google — Christmas Island AI Data Node — 7 MW, Flying Fish Cove, Australia (Google) · announced
-
Equinix MD5 Madrid (Spain) — 6 MW, Alcobendas, Spain (Equinix) · announced
-
Leonardo AI Supercomputing Facility — 6 MW, Bologna, Italy (CINECA) · operational
-
Aqaba Digital Hub “Mega” Data Center (Jordan) — 6 MW, Aqaba, Jordan (Aqaba Digital Hub) · operational
-
MeluXina AI Supercomputer Facility — 3 MW, Bissen, Luxembourg (LuxProvide) · operational
-
Discoverer+ AI Supercomputer Upgrade — 2 MW, Sofia, Bulgaria (Sofia Tech Park) · operational
-
NVIDIA Cambridge-1 Supercomputer — 1 MW, Harlow, United Kingdom (NVIDIA) · operational
-
Equinix LG3 Lagos (Nigeria) — 1 MW, Lagos, Nigeria (Equinix) · announced
-
OpenAI Stargate Lordstown, Warren, OH, United States (Softbank) · under construction
-
Magdeburg Fab, Magdeburg, Germany, Germany (Intel) · announced
-
Fab 52 (18A), Chandler, AZ, United States (Intel) · operational
-
Clay NY Fab, Clay, NY, United States (Micron) · under construction
-
Taylor Fab, Taylor, TX, United States (Samsung) · under construction
-
Pyeongtaek P4, Pyeongtaek, South Korea, South Korea (Samsung) · under construction
-
M15X HBM Fab, Cheongju, South Korea, South Korea (SK Hynix) · under construction
-
Fab 21 Phase 1 (N4), Phoenix, AZ, United States (TSMC) · operational
-
ESMC Dresden, Dresden, Germany, Germany (TSMC) · under construction
-
Hiroshima HBM Fab, Hiroshima, Japan, Japan (Micron) · announced
-
JASM Fab 1 (Kumamoto), Kumamoto, Japan, Japan (TSMC) · operational
-
Oracle Malaysia Region, Kuala Lumpur, Malaysia, Malaysia (Oracle) · under construction
-
Kenilworth Campus, Kenilworth, NJ, United States (CoreWeave) · under construction
-
Beaver Dam DC, Beaver Dam, WI, United States (Meta) · under construction
-
Lenoir Expansion, Lenoir, NC, United States (Google) · announced
-
Stargate Shackelford County, Shackelford County, TX, United States (Oracle) · announced
-
Oracle Michigan DC, Saline Township, MI, United States (Oracle) · under construction
-
Boise Fab Expansion, Boise, ID, United States (Micron) · under construction
-
AIRAWAT AI Supercomputer (India), Pune, India (Centre for Development of Advanced Computing (C-DAC)) · operational
-
AIST ABCI-3 Supercomputer (Japan), Tsukuba, Japan (National Institute of Advanced Industrial Science and Technology (AIST)) · operational
-
NSCC ASPIRE-2A Supercomputer (Singapore), Singapore, Singapore (National Supercomputing Centre (NSCC) Singapore) · operational
-
SenseTime Lin-gang AIDC (China), Shanghai, China (SenseTime) · operational
-
NVIDIA “Israel-1” AI Supercomputer (Israel), Israel (cloud access), Israel (NVIDIA) · operational
-
Cassava AI Data Center (Morocco), Casablanca, Morocco (Cassava Technologies) · announced