Maryland Data Centers
Live tracking of every data center project in Maryland (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 0
- Under construction: 2
- Announced: 4
- Pipeline capacity: 5.9 GW
Maryland's growth is centered on Quantum Frederick, the former Alcoa site in Adamstown, where Rowan's 625 MW Bauxite campus is operating and Aligned is building 264 MW. Lerner's 820 MW Brightseat Tech Park at the old Landover Mall is permitted, and TeraWulf plans 1 GW at the Morgantown Generating Station in Newburg.
Data Center Index tracks 6 named data center campuses in Maryland (large sites with a source, not every building): 0 operating, 2 under construction, and 4 announced or permitted. The pipeline adds up to 5.9 GW of planned capacity. Below: every tracked project in Maryland, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Maryland
- Calvert Cliffs Relicense, Lusby · operational · developer: Constellation
- Quantum Frederick Campus, 2.4 GW, Adamstown · under construction · developer: Catellus Development Corporation (TPG Real Estate)
- Rowan Bauxite I, II & III (Quantum Frederick), 625 MW, Adamstown · under construction · developer: Rowan Digital Infrastructure · tenant: Amazon Web Services
- AWS Adamstown (Quantum Frederick), 300 MW, Adamstown · under construction · developer: Amazon Web Services
- Aligned IAD-04 Frederick Campus (Quantum Frederick), 264 MW, Frederick · under construction · developer: Aligned Data Centers
- TeraWulf Chesapeake Data Campus (Morgantown Generating Station), 1 GW, Newburg · announced · developer: TeraWulf
- Atmosphere Dickerson Data Center Campus, 360 MW, Dickerson · announced · developer: Atmosphere Data Centers
- Security Land and Development Woodlawn Data Center Campus, 150 MW, Woodlawn · announced · developer: Security Land and Development LP
- Brightseat Tech Park (Landover Mall site), 820 MW, Landover · permitted · developer: Lerner Enterprises · ~$5B
Frequently asked questions
- How many data centers are in Maryland?
- Data Center Index tracks 6 named data center campuses in Maryland as of 2026: 0 operating, 2 under construction, and 4 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Maryland have?
- No operating capacity is published, with 5.9 GW in the announced and under-construction pipeline. Of the 7 Maryland campuses with a capacity figure, 0 are filed, 7 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in Maryland?
- Quantum Frederick Campus in Adamstown is the largest tracked campus in Maryland at 2.4 GW, developed by Catellus Development Corporation (TPG Real Estate). The developer or the press states that capacity.
- Who is building data centers in Maryland?
- Developers with a tracked campus in Maryland include Constellation, Catellus Development Corporation (TPG Real Estate), Rowan Digital Infrastructure. Every campus page lists its developer, tenant and the source that names them.
Public companies exposed to Maryland
These public companies have tracked data-center projects in Maryland as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Constellation Energy (CEG), energy · 1 project in Maryland
- Emerson Electric (EMR), power equipment · 1 project in Maryland
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 107 tracked projects, 41.4 GW pipeline
- Utah data centers, 14 tracked projects, 14.3 GW pipeline
- Virginia data centers, 94 tracked projects, 13.6 GW pipeline
- Ohio data centers, 48 tracked projects, 13.2 GW pipeline
- Georgia data centers, 47 tracked projects, 9.9 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Pennsylvania data centers, 26 tracked projects, 7.1 GW pipeline
- Kansas data centers, 11 tracked projects, 6.7 GW pipeline
- Illinois data centers, 15 tracked projects, 6.2 GW pipeline
- Florida data centers, 7 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.1 GW pipeline
- Oklahoma data centers, 13 tracked projects, 4.5 GW pipeline
- Missouri data centers, 10 tracked projects, 4 GW pipeline
- Arizona data centers, 31 tracked projects, 3.9 GW pipeline
- Alabama data centers, 10 tracked projects, 3.8 GW pipeline
- Nevada data centers, 16 tracked projects, 3.4 GW pipeline
- West Virginia data centers, 9 tracked projects, 2.9 GW pipeline
- Arkansas data centers, 8 tracked projects, 2.7 GW pipeline
- North Carolina data centers, 16 tracked projects, 2.3 GW pipeline
- North Dakota data centers, 14 tracked projects, 2.2 GW pipeline
- Michigan data centers, 11 tracked projects, 2.2 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 22 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- Iowa data centers, 22 tracked projects, 1.4 GW pipeline
- New York data centers, 9 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New Mexico data centers, 3 tracked projects, 1.3 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 8 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 5 tracked projects, 840 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- Mississippi data centers, 10 tracked projects, 500 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Minnesota data centers, 6 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- Washington data centers, 5 tracked projects