Pennsylvania Data Centers
Live tracking of every data center project in Pennsylvania — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 1
- Operating and expanding: 1
- Under construction: 6
- Announced: 9
- Operating capacity: 3.0 GW
- Pipeline capacity: 16.5 GW
Pennsylvania is where nuclear meets AI. Amazon bought a 960 MW nuclear-powered campus at Berwick and is building a 1.8 GW AI campus in Salem Township, while Constellation is restarting Three Mile Island's 837 MW reactor at Middletown with Microsoft as the offtaker. CoreWeave adds a $6B, 300 MW site in Lancaster County, and Constellation and Talen are the linked power names.
Data Center Index tracks 16 named data center campuses in Pennsylvania (large sites with a source, not every building): 1 operating, 6 under construction, and 9 announced or permitted. The pipeline adds up to 16.5 GW of planned capacity. Below: every tracked project in Pennsylvania, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Pennsylvania
- TECfusions New Kensington AI Campus — 3.0 GW, New Kensington · operational · developer: TECfusions
- Pennsylvania Digital I (PAX-1) — 1.4 GW, Middlesex Township (Carlisle) · under construction · developer: PowerHouse Data Centers / Pennsylvania Data Center Partners · ~$15.0B
- Homer City Energy Campus — 4.5 GW, Homer City · under construction · developer: Homer City Redevelopment · tenant: Amazon Web Services (in discussions, no deal signed) · ~$10.0B
- Lancaster County DC — 300 MW, Lancaster County · under construction · developer: Chirisa Technology Parks / Machine Investment Group · tenant: CoreWeave · ~$6.0B
- AWS Pennsylvania Campus — 1.8 GW, Salem Township · under construction · developer: AWS · ~$4.1B
- Three Mile Island Restart — 837 MW, Middletown · under construction · developer: Constellation · tenant: Microsoft · ~$1.6B
- Aligned Project Phoenix (Shippingport) — 2.0 GW, Shippingport · under construction · developer: Aligned Data Centers
- Sentinel / Green Fig East Whiteland Data Center (Project Forge PA), East Whiteland Township · under construction · developer: Sentinel Data Centers / Green Fig LLC
- Wildcat Ridge AI Data Center Campus — 1.6 GW, Archbald · announced · developer: Cornell Realty Management · ~$2.1B
- Project Laurel (Limerick) — 750 MW, Limerick Township · announced · developer: MDC 7 LLC
- Project Atlas (South Whitehall) — 725 MW, South Whitehall Township · announced · developer: CDE Acquisitions LLC (Edged Data Centers)
- Slate Belt Holdings Upper Mount Bethel Campus — 480 MW, Upper Mount Bethel Township · announced · developer: Slate Belt Holdings (Talen Energy / River Pointe Logistics)
- Prime Data Centers Starpointe Campus — 350 MW, Hanover Township · announced · developer: Prime Data Centers
- Switch Big Beaver Campus (former Pitt Race) — 270 MW, Big Beaver Borough · announced · developer: Switch
- Project Hazelnut (Humboldt Industrial Park), Hazle Township · announced · developer: NorthPoint Development · tenant: Amazon Web Services
- Nebius Highridge Business Park AI Factory — 1.2 GW, Butler Township · permitted · developer: Nebius
- Springdale Dynamo Data Center (former Cheswick Generating Station) — 330 MW, Springdale · permitted · developer: Allegheny DC Property Company (Dynamo DC)
Frequently asked questions
- How many data centers are in Pennsylvania?
- Data Center Index tracks 16 named data center campuses in Pennsylvania as of 2026: 1 operating, 6 under construction, and 9 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Pennsylvania have?
- 3.0 GW is operating, with 16.5 GW in the announced and under-construction pipeline. 10 of the 15 Pennsylvania campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in Pennsylvania?
- Homer City Energy Campus in Homer City is the largest tracked campus in Pennsylvania at 4.5 GW, developed by Homer City Redevelopment. That capacity is an estimate, not a figure a named source states.
- Who is building data centers in Pennsylvania?
- Developers with a tracked campus in Pennsylvania include TECfusions, PowerHouse Data Centers / Pennsylvania Data Center Partners, Homer City Redevelopment. Every campus page lists its developer, tenant and the source that names them.
Public companies exposed to Pennsylvania
These public companies have tracked data-center projects in Pennsylvania as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Amazon (AMZN) — hyperscaler · 2 projects in Pennsylvania
- Constellation Energy (CEG) — energy · 1 project in Pennsylvania
- CoreWeave (CRWV) — gpu cloud · 1 project in Pennsylvania
- Emerson Electric (EMR) — power equipment · 1 project in Pennsylvania
- Generac (GNRC) — power equipment · 1 project in Pennsylvania
- Microsoft (MSFT) — hyperscaler · 1 project in Pennsylvania
- Talen Energy (TLN) — energy · 1 project in Pennsylvania
- Vertiv Holdings (VRT) — cooling · 1 project in Pennsylvania
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects