Illinois Data Centers
Live tracking of every data center project in Illinois (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 3
- Operating and expanding: 1
- Under construction: 4
- Announced: 8
- Operating capacity: 210 MW
- Pipeline capacity: 6.2 GW
- Grid: PJM
Illinois's biggest plans sit in the Chicago suburbs and beyond. PowerHouse and Hillwood's 1.8 GW Joliet Technology Center is permitted, T5 is building a 1.2 GW campus in Grayslake, and Compass is turning the former Sears headquarters in Hoffman Estates into a 200 MW campus. Meta operates in DeKalb, CyrusOne is building in Aurora and Yorkville, and Monarch has announced a 1.4 GW campus in Rockford.
Data Center Index tracks 15 named data center campuses in Illinois (large sites with a source, not every building): 3 operating, 4 under construction, and 8 announced or permitted. The pipeline adds up to 6.2 GW of planned capacity. The grid is operated by PJM, which runs the interconnection queue. Below: every tracked project in Illinois, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Illinois
- Meta DeKalb Data Center, DeKalb · operational · developer: Meta · ~$1B
- CyrusOne Aurora Campus, Aurora · operational · developer: CyrusOne · tenant: CME Group / Google · ~$0.3B
- Aligned Chicago Campus (ORD-01 / ORD-02, Northlake), 100 MW, Northlake · operational · developer: Aligned Data Centers
- Aurora Supercomputer, Argonne National Laboratory, 60 MW, Lemont · operational · developer: Argonne National Laboratory
- Microsoft Inflection AI Pi Infrastructure (Midwest), 50 MW, Chicago · operational · developer: Microsoft
- T5 @ Chicago IV (Grayslake), 1.2 GW, Grayslake · under construction · developer: T5 Data Centers · ~$18B
- Compass Hoffman Estates (former Sears HQ), 200 MW, Hoffman Estates · under construction · developer: Compass Datacenters · ~$10B
- CyrusOne Yorkville Technology Campus, 480 MW, Yorkville · under construction · developer: CyrusOne
- Stream ORDC Elk Grove Village Campus, Elk Grove Village · under construction · developer: Stream Data Centers
- Monarch Rock Air Data Center Campus (Rockford), 1.4 GW, Rockford · announced · developer: Monarch Energy · ~$12B
- Hut 8 Logan Prairie Data Center, 500 MW, Latham · announced · developer: Hut 8 · ~$5B
- Joliet Technology Center, 1.8 GW, Joliet · permitted · developer: PowerHouse Data Centers / Hillwood · ~$20B
- CyrusOne Sangamon County Campus (Talkington Township), 600 MW, Waverly · permitted · developer: CyrusOne · ~$0.5B
- Project Cardinal (Yorkville), Yorkville · permitted · developer: Pioneer Development
- Project Steel (Yorkville), Yorkville · permitted · developer: Prologis
- Edged DeKalb (Project Vector), DeKalb · permitted · developer: Edged Energy
- Equinix Minooka Campus, Minooka · permitted · developer: Equinix
Frequently asked questions
- How many data centers are in Illinois?
- Data Center Index tracks 15 named data center campuses in Illinois as of 2026: 3 operating, 4 under construction, and 8 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Illinois have?
- 210 MW is operating, with 6.2 GW in the announced and under-construction pipeline. Of the 10 Illinois campuses with a capacity figure, 0 are filed, 7 stated and 3 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in Illinois?
- Joliet Technology Center in Joliet is the largest tracked campus in Illinois at 1.8 GW, developed by PowerHouse Data Centers / Hillwood. The developer or the press states that capacity, in a source dated September 21, 2026.
- Who is building data centers in Illinois?
- The most active developers in Illinois by tracked campus count are CyrusOne (3 campuses), Meta (1 campus), Aligned Data Centers (1 campus). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Illinois data centers?
- PJM runs the grid and the interconnection queue for Illinois, so new campus power requests are approved on its timeline.
Public companies exposed to Illinois
These public companies have tracked data-center projects in Illinois as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Intel (INTC), chip fab · 1 project in Illinois
- Meta Platforms (META), hyperscaler · 1 project in Illinois
- Microsoft (MSFT), hyperscaler · 1 project in Illinois
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 107 tracked projects, 41.4 GW pipeline
- Utah data centers, 14 tracked projects, 14.3 GW pipeline
- Virginia data centers, 94 tracked projects, 13.6 GW pipeline
- Ohio data centers, 48 tracked projects, 13.2 GW pipeline
- Georgia data centers, 47 tracked projects, 9.9 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Pennsylvania data centers, 26 tracked projects, 7.1 GW pipeline
- Kansas data centers, 11 tracked projects, 6.7 GW pipeline
- Florida data centers, 7 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.1 GW pipeline
- Oklahoma data centers, 13 tracked projects, 4.5 GW pipeline
- Missouri data centers, 10 tracked projects, 4 GW pipeline
- Arizona data centers, 31 tracked projects, 3.9 GW pipeline
- Alabama data centers, 10 tracked projects, 3.8 GW pipeline
- Nevada data centers, 16 tracked projects, 3.4 GW pipeline
- Maryland data centers, 6 tracked projects, 3.2 GW pipeline
- West Virginia data centers, 9 tracked projects, 2.9 GW pipeline
- Arkansas data centers, 8 tracked projects, 2.7 GW pipeline
- North Carolina data centers, 16 tracked projects, 2.3 GW pipeline
- North Dakota data centers, 14 tracked projects, 2.2 GW pipeline
- Michigan data centers, 11 tracked projects, 2.2 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 22 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- Iowa data centers, 22 tracked projects, 1.4 GW pipeline
- New York data centers, 9 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New Mexico data centers, 3 tracked projects, 1.3 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 8 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 5 tracked projects, 840 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- Mississippi data centers, 10 tracked projects, 500 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Minnesota data centers, 6 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- Washington data centers, 5 tracked projects