Illinois Data Centers
Live tracking of every data center project in Illinois — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 2
- Under construction: 4
- Announced: 7
- Operating capacity: 1.0 GW
- Pipeline capacity: 5.5 GW
- Grid: PJM
Illinois has three tracked projects on PJM. Meta's 800 MW AI training campus in Cortland is under construction, and the public-sector anchor is the Aurora supercomputer at Argonne National Laboratory in Lemont, a 60 MW exascale system. Microsoft's Inflection-era Chicago cluster rounds out the list.
Data Center Index tracks 13 named data center campuses in Illinois (large sites with a source, not every building): 2 operating, 4 under construction, and 7 announced or permitted. The pipeline adds up to 5.5 GW of planned capacity. The grid is operated by PJM, which runs the interconnection queue. Below: every tracked project in Illinois, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Illinois
- Meta AI Training Campus (Cortland, Illinois) — 800 MW, Cortland · operational · developer: Meta
- Aligned Chicago Campus (ORD-01 / ORD-02, Northlake) — 100 MW, Northlake · operational · developer: Aligned Data Centers
- Aurora Supercomputer — Argonne National Laboratory — 60 MW, Lemont · operational · developer: Argonne National Laboratory
- Microsoft — Inflection AI Pi Infrastructure (Midwest) — 50 MW, Chicago · operational · developer: Microsoft
- T5 @ Chicago IV (Grayslake) — 1.2 GW, Grayslake · under construction · developer: T5 Data Centers · ~$18.0B
- Compass Hoffman Estates (former Sears HQ), Hoffman Estates · under construction · developer: Compass Datacenters · ~$10.0B
- CyrusOne Aurora Campus — 40 MW, Aurora · under construction · developer: CyrusOne · ~$0.3B
- CyrusOne Yorkville Technology Campus — 480 MW, Yorkville · under construction · developer: CyrusOne
- Monarch Rock Air Data Center Campus (Rockford) — 1.4 GW, Rockford · announced · developer: Monarch Energy · ~$12.0B
- Joliet Technology Center — 1.8 GW, Joliet · permitted · developer: PowerHouse Data Centers / Hillwood · ~$20.0B
- CyrusOne Sangamon County Campus (Talkington Township) — 600 MW, Waverly · permitted · developer: CyrusOne · ~$0.5B
- Project Cardinal (Yorkville), Yorkville · permitted · developer: Pioneer Development
- Project Steel (Yorkville), Yorkville · permitted · developer: Prologis
- Edged DeKalb (Project Vector), DeKalb · permitted · developer: Edged (Endeavour Energy)
- Equinix Minooka Campus, Minooka · permitted · developer: Equinix
Frequently asked questions
- How many data centers are in Illinois?
- Data Center Index tracks 13 named data center campuses in Illinois as of 2026: 2 operating, 4 under construction, and 7 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Illinois have?
- 1.0 GW is operating, with 5.5 GW in the announced and under-construction pipeline. 6 of the 10 Illinois campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in Illinois?
- Joliet Technology Center in Joliet is the largest tracked campus in Illinois at 1.8 GW, developed by PowerHouse Data Centers / Hillwood. That capacity is stated by a named source.
- Who is building data centers in Illinois?
- The most active developers in Illinois by tracked campus count are CyrusOne (3 campuses), Meta (1 campus), Aligned Data Centers (1 campus). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Illinois data centers?
- PJM runs the grid and the interconnection queue for Illinois, so new campus power requests are approved on its timeline.
Public companies exposed to Illinois
These public companies have tracked data-center projects in Illinois as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Intel (INTC) — chip fab · 1 project in Illinois
- Meta Platforms (META) — hyperscaler · 1 project in Illinois
- Microsoft (MSFT) — hyperscaler · 1 project in Illinois
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects