Arkansas Data Centers

Live tracking of every data center project in Arkansas (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.

Data Center Index tracks 7 named data center campuses in Arkansas (large sites with a source, not every building): 0 operating, 2 under construction, and 5 announced or permitted. The pipeline adds up to 1.9 GW of planned capacity. Below: every tracked project in Arkansas, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.

Tracked data center projects in Arkansas

Frequently asked questions

How many data centers are in Arkansas?
Data Center Index tracks 7 named data center campuses in Arkansas as of 2026: 0 operating, 2 under construction, and 5 announced or permitted. Coverage is named campuses with a published source, not every building.
How much data center capacity does Arkansas have?
No operating capacity is published, with 1.9 GW in the announced and under-construction pipeline. Of the 5 Arkansas campuses with a capacity figure, 0 are filed, 0 stated and 5 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
What is the largest data center in Arkansas?
AVAIO Digital Leo Campus in Wrightsville is the largest tracked campus in Arkansas at 1 GW, developed by AVAIO Digital. That capacity is an estimate. We modeled or inferred it, and no source states it.
Who is building data centers in Arkansas?
The most active developers in Arkansas by tracked campus count are Google (2 campuses), Serverfarm (1 campus), AVAIO Digital (1 campus). Every campus page lists its developer, tenant and the source that names them.