California Data Centers
Live tracking of every data center project in California — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 5
- Under construction: 3
- Announced: 7
- Operating capacity: 356 MW
- Pipeline capacity: 1.4 GW
California's tracked capacity is small and colocation-shaped: Equinix's SV18 (117 MW, announced) and SV12x (36 MW, under construction) in San Jose, and Vantage's 200 MW campus in Santa Clara. The largest row is PG&E's 2.26 GW Diablo Canyon nuclear plant, tracked for its AI-load integration, alongside the 40 MW El Capitan supercomputer at Lawrence Livermore.
Data Center Index tracks 15 named data center campuses in California (large sites with a source, not every building): 5 operating, 3 under construction, and 7 announced or permitted. The pipeline adds up to 1.4 GW of planned capacity. Below: every tracked project in California, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in California
- Vantage Data Centers — US West AI Campus (Santa Clara/Phoenix) — 144 MW, Santa Clara · operational · developer: Vantage Data Centers
- Waymo / Google — Autonomous Driving AI Training Cluster — 80 MW, Mountain View · operational · developer: Google
- STACK SVY02 Santa Clara Campus — 48 MW, Santa Clara · operational · developer: STACK Infrastructure
- El Capitan Supercomputer — Lawrence Livermore National Laboratory — 30 MW, Livermore · operational · developer: Lawrence Livermore National Laboratory
- SV12x Silicon Valley — 28 MW, San Jose · operational · developer: Equinix
- Prime Data Centers Sacramento Campus (SMF01/SMF02) — 26 MW, Sacramento · operational · developer: Prime Data Centers
- Diablo Canyon AI Integration Project, Avila Beach · operational · developer: Pacific Gas and Electric Company (PG&E)
- AWS Gilroy Data Center — 49 MW, Gilroy · under construction · developer: Amazon Web Services
- Microsoft Alviso Data Center Campus — 48 MW, San Jose · under construction · developer: Microsoft
- DataBank / Goodman Vernon Data Center — 32 MW, Vernon · under construction · developer: DataBank
- Prologis San Jose Data Center & Advanced Manufacturing Campus (Zanker Road) — 396 MW, San Jose · announced · developer: Prologis
- Golden Valley Technology Hub (Elk Hills) — 275 MW, Tupman · announced · developer: California Resources Corp. / Beacon Data Centers
- NAS Lemoore AI Data Center (Ameresco / CyrusOne) — 100 MW, Lemoore · announced · developer: CyrusOne · tenant: U.S. Navy
- Goodman Innovation Center San Jose — 97 MW, San Jose · announced · developer: Goodman Group
- Terra Data Center (Alviso), San Jose · announced · developer: Terra Ventures
- Imperial Data Center (Imperial Valley Computer Manufacturing) — 330 MW, Imperial · permitted · developer: Imperial Valley Computer Manufacturing LLC · ~$10.0B
- Equinix SV18 Silicon Valley (California) — 117 MW, San Jose · permitted · developer: Equinix
Frequently asked questions
- How many data centers are in California?
- Data Center Index tracks 15 named data center campuses in California as of 2026: 5 operating, 3 under construction, and 7 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does California have?
- 356 MW is operating, with 1.4 GW in the announced and under-construction pipeline. 7 of the 15 California campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in California?
- Prologis San Jose Data Center & Advanced Manufacturing Campus (Zanker Road) in San Jose is the largest tracked campus in California at 396 MW, developed by Prologis. That capacity is stated by a named source.
- Who is building data centers in California?
- The most active developers in California by tracked campus count are Equinix (2 campuses), Vantage Data Centers (1 campus), Google (1 campus). Every campus page lists its developer, tenant and the source that names them.
Public companies exposed to California
These public companies have tracked data-center projects in California as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Equinix (EQIX) — dc operator · 2 projects in California
- Advanced Micro Devices (AMD) — semiconductor · 1 project in California
- Emerson Electric (EMR) — power equipment · 1 project in California
- Alphabet (GOOGL) — hyperscaler · 1 project in California
- Vantage Data Centers (VANTAGE) — dc operator · 1 project in California
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects