El Capitan Supercomputer — Lawrence Livermore National Laboratory
40 MW AI data center in Livermore, CA, United States — operational.
- Capacity: 40 MW
- Location: Livermore, CA, United States
- Developer: Lawrence Livermore National Laboratory
- Status: operational
- Energy source: Mixed
El Capitan Supercomputer — Lawrence Livermore National Laboratory is a 40 MW AI data center project located in Livermore, CA, United States, currently operational. It is being built by Lawrence Livermore National Laboratory. Power for the facility is sourced from Mixed. This project is one of thousands of data-center facilities tracked by Data Center Index across CA, United States — covering operational, under-construction, announced, and permitted sites.
Project description
El Capitan at Lawrence Livermore is the world-class exascale system tracked at 40 MW, operational since 2024 and built on AMD silicon — national-lab AI training capacity alongside the commercial buildout.
Public companies linked to El Capitan Supercomputer — Lawrence Livermore National Laboratory
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Advanced Micro Devices (AMD) — developer · semiconductor
Related data center projects
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Microsoft Fairwater Wisconsin — 2.7 GW, Mount Pleasant, WI, United States · operational
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- OpenAI Stargate New Mexico — 2.5 GW, NM, United States · under construction
- AWS Project Rainier (New Carlisle, Indiana) — 2.4 GW, New Carlisle, IN, United States · operational
- Anthropic-Amazon New Carlisle — 2.3 GW, New Carlisle, IN, United States · operational
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · operational