Golden Valley Technology Hub (Elk Hills)
275 MW AI data center in Tupman, CA, United States — announced.
- Capacity: 275 MW
- Location: Tupman, CA, United States
- Developer: California Resources Corp. / Beacon Data Centers
- Status: announced
Golden Valley Technology Hub (Elk Hills) is a 275 MW AI data center project located in Tupman, CA, United States, currently announced. It is being built by California Resources Corp. / Beacon Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across CA, United States — covering operational, under-construction, announced, and permitted sites.
Project description
CRC and Calgary-based Beacon Data Centers propose a 275 MW, ~400,000 sq ft data center on ~100 acres at the Elk Hills oil field in western Kern County, powered by surplus capacity from CRC's Elk Hills gas plant; CRC planned to file for a conditional use permit with a ~2-year environmental review.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted