- Operating: 1
- Operating and expanding: 1
- Under construction: 5
- Announced: 4
- Pipeline capacity: 1.7 GW
- Grid: MISO
Amazon and Anthropic put Mississippi on the AI map: the Madison Mega Site in Canton is operating and the Ridgeland campus is under construction, both with Anthropic as tenant. xAI is building in Southaven, AWS has further sites in Clinton and Vicksburg, and Compass is building a campus in Meridian.
Data Center Index tracks 10 named data center campuses in Mississippi (large sites with a source, not every building): 1 operating, 5 under construction, and 4 announced or permitted. The pipeline adds up to 1.7 GW of planned capacity. The grid is operated by MISO, which runs the interconnection queue. Below: every tracked project in Mississippi, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Mississippi
- Amazon Madison Mega Site, Canton · operational · developer: Amazon Web Services · tenant: Anthropic · ~$10.8B
- xAI MACROHARDRR Southaven, Southaven · under construction · developer: SpaceXAI · tenant: xAI · ~$20B
- Amazon Ridgeland, Ridgeland · under construction · developer: Amazon Web Services · ~$11B
- Compass Datacenters Meridian Campus, 500 MW, Meridian · under construction · developer: Compass Datacenters · tenant: Corderill LLC · ~$10B
- AVAIO Digital Taurus Data Center Hub, Brandon · under construction · developer: AVAIO Digital · ~$6B
- AWS Clinton Data Center (former Delphi plant), Clinton · under construction · developer: Amazon Web Services · ~$1B
- xAI Stanton Road Power Plant (Southaven), 1.2 GW, Southaven · under construction · developer: xAI
- Big Woods Technology Park, Bassfield · announced · developer: Eagle Rock Partners · ~$6B
- AWS Warren County (Vicksburg) Campus, Vicksburg · announced · developer: Amazon Web Services · ~$3B
- Echelon Data Centres Lauderdale County Site, Meridian · announced · developer: Echelon Data Centres
- SpaceXAI Tulane Road Data Center (Southaven), Southaven · permitted · developer: SpaceXAI · tenant: xAI
Frequently asked questions
- How many data centers are in Mississippi?
- Data Center Index tracks 10 named data center campuses in Mississippi as of 2026: 1 operating, 5 under construction, and 4 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Mississippi have?
- No operating capacity is published, with 1.7 GW in the announced and under-construction pipeline. Of the 2 Mississippi campuses with a capacity figure, 0 are filed, 1 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in Mississippi?
- xAI Stanton Road Power Plant (Southaven) in Southaven is the largest tracked campus in Mississippi at 1.2 GW, developed by xAI. The developer or the press states that capacity.
- Who is building data centers in Mississippi?
- The most active developers in Mississippi by tracked campus count are Amazon Web Services (4 campuses), SpaceXAI (2 campuses), Compass Datacenters (1 campus). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Mississippi data centers?
- MISO runs the grid and the interconnection queue for Mississippi, so new campus power requests are approved on its timeline.
Public companies exposed to Mississippi
These public companies have tracked data-center projects in Mississippi as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Amazon (AMZN), hyperscaler · 2 projects in Mississippi
- Anthropic (ANTHROPIC), ai lab · 2 projects in Mississippi
- SK Hynix (000660.KS), chip fab · 1 project in Mississippi
- Credo Technology (CRDO), networking · 1 project in Mississippi
- Micron Technology (MU), chip fab · 1 project in Mississippi
- Trane Technologies (TT), cooling · 1 project in Mississippi
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 107 tracked projects, 41.4 GW pipeline
- Utah data centers, 14 tracked projects, 14.3 GW pipeline
- Virginia data centers, 94 tracked projects, 13.6 GW pipeline
- Ohio data centers, 48 tracked projects, 13.2 GW pipeline
- Georgia data centers, 47 tracked projects, 9.9 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Pennsylvania data centers, 26 tracked projects, 7.1 GW pipeline
- Kansas data centers, 11 tracked projects, 6.7 GW pipeline
- Illinois data centers, 15 tracked projects, 6.2 GW pipeline
- Florida data centers, 7 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.1 GW pipeline
- Oklahoma data centers, 13 tracked projects, 4.5 GW pipeline
- Missouri data centers, 10 tracked projects, 4 GW pipeline
- Arizona data centers, 31 tracked projects, 3.9 GW pipeline
- Alabama data centers, 10 tracked projects, 3.8 GW pipeline
- Nevada data centers, 16 tracked projects, 3.4 GW pipeline
- Maryland data centers, 6 tracked projects, 3.2 GW pipeline
- West Virginia data centers, 9 tracked projects, 2.9 GW pipeline
- Arkansas data centers, 8 tracked projects, 2.7 GW pipeline
- North Carolina data centers, 16 tracked projects, 2.3 GW pipeline
- North Dakota data centers, 14 tracked projects, 2.2 GW pipeline
- Michigan data centers, 11 tracked projects, 2.2 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 22 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- Iowa data centers, 22 tracked projects, 1.4 GW pipeline
- New York data centers, 9 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New Mexico data centers, 3 tracked projects, 1.3 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 8 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 5 tracked projects, 840 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Minnesota data centers, 6 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- Washington data centers, 5 tracked projects