New York Data Centers
Live tracking of every data center project in New York (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 4
- Operating and expanding: 1
- Under construction: 0
- Announced: 5
- Operating capacity: 1.6 GW
- Pipeline capacity: 2.3 GW
- Grid: NYISO
TeraWulf's Lake Mariner campus in Barker, on Lake Ontario, runs AI capacity for Fluidstack, and Stream has announced a 500 MW campus at the STAMP site in Genesee County. NYDIG plans a 400 MW expansion in Massena, and Ranalli has a 300 MW project announced in Lysander.
Data Center Index tracks 9 named data center campuses in New York (large sites with a source, not every building): 4 operating, 0 under construction, and 5 announced or permitted. The pipeline adds up to 2.3 GW of planned capacity. The grid is operated by NYISO, which runs the interconnection queue. Below: every tracked project in New York, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in New York
- TeraWulf Lake Mariner Campus, 750 MW, Barker · operational · developer: TeraWulf · tenant: Fluidstack · ~$2.2B
- Tesla Dojo Supercomputer, Buffalo New York, 500 MW, Buffalo · operational · developer: Tesla
- Blockfusion Niagara Falls Campus, 300 MW, Niagara Falls · operational · developer: Blockfusion USA · tenant: CoreWeave
- H5 Data Centers Lockport Campus (Yahoo), Lockport · operational · developer: H5 Data Centers · tenant: Yahoo
- DataBank Orangeburg Campus, Orangeburg · operational · developer: DataBank
- Clay NY Fab, Clay · under construction · developer: Micron · ~$20B
- Stream Data Centers STAMP Campus, 500 MW, Alabama · announced · developer: Stream Data Centers · ~$19.5B
- Niagara Digital Campus, 135 MW, Niagara Falls · announced · developer: Niagara Falls Redevelopment (Urbacon) · ~$1.5B
- NCCS Massena Data Center Expansion, 400 MW, Massena · announced · developer: North Country Colocation Services (NYDIG)
- Ranalli Super DC Lysander Data Center, 300 MW, Lysander · announced · developer: Ranalli Super DC, LLC
- Greenidge Dresden AI/HPC Datacenter, 60 MW, Dresden · announced · developer: Greenidge Generation
- Riverview Innovation and Technology Campus Data Center (Tonawanda Coke site), 300 MW, Tonawanda · paused · developer: Riverview Innovation & Technology Campus · ~$2B
- Brookhaven Digital Infrastructure Facility (Yaphank), 177 MW, Yaphank · paused · developer: WF Industrial (Wildflower) · ~$1B
- TeraWulf Cayuga Data Campus (Lake Hawkeye), 400 MW, Lansing · paused · developer: TeraWulf
Frequently asked questions
- How many data centers are in New York?
- Data Center Index tracks 9 named data center campuses in New York as of 2026: 4 operating, 0 under construction, and 5 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does New York have?
- 1.6 GW is operating, with 2.3 GW in the announced and under-construction pipeline. Of the 8 New York campuses with a capacity figure, 0 are filed, 5 stated and 3 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in New York?
- TeraWulf Lake Mariner Campus in Barker is the largest tracked campus in New York at 750 MW, developed by TeraWulf. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building data centers in New York?
- Developers with a tracked campus in New York include TeraWulf, Tesla, Blockfusion USA. Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves New York data centers?
- NYISO runs the grid and the interconnection queue for New York, so new campus power requests are approved on its timeline.
Public companies exposed to New York
These public companies have tracked data-center projects in New York as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Alphabet (GOOGL), hyperscaler · 3 projects in New York
- Anthropic (ANTHROPIC), ai lab · 1 project in New York
- Fluor Corp (FLR), construction · 1 project in New York
- Micron Technology (MU), chip fab · 1 project in New York
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 107 tracked projects, 41.4 GW pipeline
- Utah data centers, 14 tracked projects, 14.3 GW pipeline
- Virginia data centers, 94 tracked projects, 13.6 GW pipeline
- Ohio data centers, 48 tracked projects, 13.2 GW pipeline
- Georgia data centers, 47 tracked projects, 9.9 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Pennsylvania data centers, 26 tracked projects, 7.1 GW pipeline
- Kansas data centers, 11 tracked projects, 6.7 GW pipeline
- Illinois data centers, 15 tracked projects, 6.2 GW pipeline
- Florida data centers, 7 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.1 GW pipeline
- Oklahoma data centers, 13 tracked projects, 4.5 GW pipeline
- Missouri data centers, 10 tracked projects, 4 GW pipeline
- Arizona data centers, 31 tracked projects, 3.9 GW pipeline
- Alabama data centers, 10 tracked projects, 3.8 GW pipeline
- Nevada data centers, 16 tracked projects, 3.4 GW pipeline
- Maryland data centers, 6 tracked projects, 3.2 GW pipeline
- West Virginia data centers, 9 tracked projects, 2.9 GW pipeline
- Arkansas data centers, 8 tracked projects, 2.7 GW pipeline
- North Carolina data centers, 16 tracked projects, 2.3 GW pipeline
- North Dakota data centers, 14 tracked projects, 2.2 GW pipeline
- Michigan data centers, 11 tracked projects, 2.2 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 22 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- Iowa data centers, 22 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New Mexico data centers, 3 tracked projects, 1.3 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 8 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 5 tracked projects, 840 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- Mississippi data centers, 10 tracked projects, 500 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Minnesota data centers, 6 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- Washington data centers, 5 tracked projects