CoreWeave (CRWV)
GPU cloud provider that rents Nvidia-based AI computing capacity to AI labs and large tech companies from leased and self-developed data centers. Formerly Atlantic Crypto; listed on Nasdaq in March 2025.
- Type: AI cloud provider
- Ownership: Public company (CRWV)
- Headquarters: Livingston, NJ
- Founded: 2017
- Website: coreweave.com
- Ticker: CRWV
- Projects tracked: 13
- Total pipeline: 4.8 GW
Projects
- Galaxy Helios, 1.6 GW, Dickens County, TX, United States · operational
- Bulk Data Centers N01 AI Campus, 1 GW, Vennesla, Norway · operational
- CoreWeave AI Data Centers (US), 500 MW, United States · operational
- Related Digital Cheyenne Campus, 420 MW, Cheyenne, WY, United States · under construction
- Applied Digital Polaris Forge 1 (Ellendale), 400 MW, Ellendale, ND, United States · operational
- Lancaster County DC, 300 MW, Lancaster, PA, United States · under construction
- Blockfusion Niagara Falls Campus, 300 MW, Niagara Falls, NY, United States · operational
- Core Scientific Denton, 260 MW, Denton, TX, United States · operational
- CoreWeave Kenilworth (NEST) Campus, 250 MW, Kenilworth, NJ, United States · under construction
- PowerHouse / Chirisa Digital Drive (Meadowville), 200 MW, Chesterfield County, VA, United States · under construction
- Hammond DC, 180 MW, Hammond, IN, United States · cancelled
- CoreWeave UK AI Data Centers (London & Manchester), 150 MW, London, United Kingdom · operational
- Lancaster AI Hub, 216 Greenfield Road Phase 1 (Chirisa), 92 MW, Lancaster, PA, United States · under construction
- CoreWeave Marble NC, 65 MW, Marble, NC, United States · operational
- CoreWeave Dalton 1 & 2, 28 MW, Dalton, GA, United States · operational
- Chirisa Technology Parks Richmond Campus (Chester), Chesterfield County, VA, United States · operational
- EdgeConneX Cedar Creek Campus, Bastrop County, TX, United States · under construction
Frequently asked questions
- How many data centers does CoreWeave have?
- Data Center Index tracks 13 data center campuses with CoreWeave named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does CoreWeave have?
- 4.8 GW across 13 tracked campuses, counting operating and pipeline sites together. Of the 14 CoreWeave campuses with a capacity figure, 1 is filed, 4 stated and 9 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does CoreWeave build data centers?
- Tracked CoreWeave campuses sit in 12 markets: TX (3), PA (2), VA (2), GA (1), NC (1), ND (1), NJ (1), Norway (1), and 4 more. The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest CoreWeave data center?
- Galaxy Helios in Dickens County, TX is the largest tracked CoreWeave campus at 1.6 GW, currently operational. That capacity is an estimate. We modeled or inferred it, and no source states it.