CoreWeave Chester VA
197 MW AI data center in Chester, VA, United States — operational.
- Capacity: 197 MW
- Location: Chester, VA, United States
- Developer: CoreWeave
- Tenant: OpenAI
- Status: operational
- Estimated cost: $3.1B
CoreWeave Chester VA is a 197 MW AI data center project located in Chester, VA, United States, currently operational. It is being built by CoreWeave for tenant OpenAI. The estimated build cost is $3.1B. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Users: OpenAI; Epoch 'Current power' = 82 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to CoreWeave Chester VA
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- CoreWeave (CRWV) — developer · gpu cloud · high DC exposure
Related data center projects
- Coreweave Helios — 800 MW, Afton, TX, United States · operational
- CoreWeave Ellendale ND — 520 MW, Ellendale, ND, United States · operational
- CoreWeave AI Data Centers (US) — 500 MW, United States · operational
- CoreWeave Denton TX — 367 MW, Denton, TX, United States · operational
- Lancaster County DC — 300 MW, Lancaster County, PA, United States · under construction
- Hammond DC — 180 MW, Hammond, IN, United States · under construction
- Ellendale Phase 1 — 100 MW, Ellendale, ND, United States · operational
- CoreWeave Marble NC — 91 MW, Marble, NC, United States · operational