Lancaster County DC
300 MW AI data center in Lancaster County, PA, United States — under construction.
- Capacity: 300 MW
- Location: Lancaster County, PA, United States
- Developer: CoreWeave
- Status: under construction
- Estimated cost: $6.0B
Lancaster County DC is a 300 MW AI data center project located in Lancaster County, PA, United States, currently under construction. It is being built by CoreWeave. The estimated build cost is $6.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across PA, United States — covering operational, under-construction, announced, and permitted sites.
Public companies linked to Lancaster County DC
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- CoreWeave (CRWV) — developer · gpu cloud · high DC exposure
- Vertiv Holdings (VRT) — liquid cooling · cooling · high DC exposure
- Generac (GNRC) — genset · power equipment · mid DC exposure
Related data center projects
- CoreWeave AI Data Centers (US) — 500 MW, Livingston, United States · operational
- CoreWeave Denton TX — 367 MW, Denton, TX, United States · operational
- Hammond DC — 180 MW, Hammond, IN, United States · under construction
- Ellendale Phase 1 — 100 MW, Ellendale, ND, United States · operational
- Kenilworth Campus, Kenilworth, NJ, United States · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Microsoft Fairwater Wisconsin — 3.3 GW, Mount Pleasant, WI, United States · operational