CoreWeave Denton TX
367 MW AI data center in Denton, TX, United States — operational.
- Capacity: 367 MW
- Location: Denton, TX, United States
- Developer: CoreWeave
- Status: operational
- Estimated cost: $2.9B
CoreWeave Denton TX is a 367 MW AI data center project located in Denton, TX, United States, currently operational. It is being built by CoreWeave. The estimated build cost is $2.9B. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 183 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to CoreWeave Denton TX
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- CoreWeave (CRWV) — developer · gpu cloud · high DC exposure
Related data center projects
- CoreWeave AI Data Centers (US) — 500 MW, Livingston, United States · operational
- Lancaster County DC — 300 MW, Lancaster County, PA, United States · under construction
- Hammond DC — 180 MW, Hammond, IN, United States · under construction
- Ellendale Phase 1 — 100 MW, Ellendale, ND, United States · operational
- Kenilworth Campus, Kenilworth, NJ, United States · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Microsoft Fairwater Wisconsin — 3.3 GW, Mount Pleasant, WI, United States · operational