Texas Data Centers
Live tracking of every data center project in Texas (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 28
- Operating and expanding: 12
- Under construction: 37
- Announced: 42
- Operating capacity: 7.8 GW
- Pipeline capacity: 44.9 GW
- Grid: ERCOT
Texas is the center of the AI data center buildout, and most of it sits on ERCOT's grid. OpenAI's Stargate campus in Abilene is already running at 1.2 GW, with more Stargate sites under construction in Shackelford County (1.4 GW) and Milam County (1.2 GW), alongside IREN's 2 GW Sweetwater campus and Nexus's Hubbard campus for Anthropic. The announced pipeline reaches further still, led by Data City Texas in Laredo at 5 GW and Tract's 4 GW Caldwell Valley Technology Park in Uhland.
Data Center Index tracks 107 named data center campuses in Texas (large sites with a source, not every building): 28 operating, 37 under construction, and 42 announced or permitted. The pipeline adds up to 44.9 GW of planned capacity. The grid is operated by ERCOT, which runs the interconnection queue. Below: every tracked project in Texas, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Texas
- OpenAI Stargate Abilene, 1.2 GW, Abilene · operational · developer: Crusoe · tenant: Oracle / OpenAI · ~$15B
- Core Scientific Denton, 260 MW, Denton · operational · developer: Core Scientific · tenant: CoreWeave · ~$6.1B
- Google Midlothian, Midlothian · operational · developer: Google · ~$3.9B
- Microsoft SAT40, 75 MW, San Antonio · operational · developer: Microsoft · ~$2.8B
- Microsoft SAT14, 47 MW, San Antonio · operational · developer: Microsoft · ~$1.8B
- Childress Campus, 750 MW, Childress · operational · developer: IREN · tenant: Microsoft · ~$1.5B
- Meta Temple, Temple · operational · developer: Meta · ~$1.2B
- Vantage TX1, 128 MW, San Antonio · operational · developer: Vantage Data Centers · ~$0.9B
- Google Red Oak, Red Oak · operational · developer: Google · ~$0.6B
- Galaxy Helios, 1.6 GW, Afton · operational · developer: Galaxy Digital · tenant: CoreWeave
- Ionic Digital Cedarvale Campus, 700 MW, Barstow · operational · developer: Ionic Digital · tenant: Nscale
- Bitdeer Rockdale, 563 MW, Rockdale · operational · developer: Bitdeer Technologies Group
- Compass Red Oak Campus, 360 MW, Red Oak · operational · developer: Compass Datacenters
- Microsoft San Antonio, Texas AI Data Center Campus, 300 MW, San Antonio · operational · developer: Microsoft
- MARA Granbury, 300 MW, Granbury · operational · developer: MARA Holdings
- Riot Rockdale AI Campus, 241 MW, Rockdale · operational · developer: Riot Platforms · tenant: Anthropic
- Cipher Black Pearl, 216 MW, Wink · operational · developer: Cipher Digital · tenant: Amazon Web Services
- Cipher Odessa, 207 MW, Odessa · operational · developer: Cipher Digital
- Hut 8 Vega, 205 MW, Vega · operational · developer: Hut 8
- Stream San Antonio III, 200 MW, San Antonio · operational · developer: Stream Data Centers
- Applied Digital Garden City, 200 MW, Garden City · operational · developer: Applied Digital
- Soluna Project Kati, 166 MW, Lyford · operational · developer: Soluna Holdings
- Sabey Round Rock, 84 MW, Round Rock · operational · developer: Sabey Data Centers
- Cerebras Systems Condor Galaxy AI Supercomputer, 30 MW, Dallas · operational · developer: Cerebras Systems
- Soluna Project Dorothy, Silverton · operational · developer: Soluna Holdings
Texas data centers by region
- North Texas data centers, 27 campuses
- Central Texas data centers, 19 campuses
- West Texas data centers, 12 campuses
- Abilene and the Big Country data centers, 8 campuses
- Texas Panhandle and South Plains data centers, 12 campuses
- San Antonio and South Texas data centers, 14 campuses
Frequently asked questions
- How many data centers are in Texas?
- Data Center Index tracks 107 named data center campuses in Texas as of 2026: 28 operating, 37 under construction, and 42 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Texas have?
- 7.8 GW is operating, with 44.9 GW in the announced and under-construction pipeline. Of the 64 Texas campuses with a capacity figure, 6 are filed, 38 stated and 20 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in Texas?
- Nexus Hubbard Campus in Hubbard is the largest tracked campus in Texas at 7.7 GW, developed by Nexus Data Centers. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building data centers in Texas?
- The most active developers in Texas by tracked campus count are CyrusOne (8 campuses), Microsoft (5 campuses), Cipher Digital (5 campuses). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Texas data centers?
- ERCOT runs the grid and the interconnection queue for Texas, so new campus power requests are approved on its timeline.
Public companies exposed to Texas
These public companies have tracked data-center projects in Texas as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Microsoft (MSFT), hyperscaler · 6 projects in Texas
- Alphabet (GOOGL), hyperscaler · 5 projects in Texas
- GE Vernova (GEV), power equipment · 3 projects in Texas
- OpenAI (OPENAI), ai lab · 3 projects in Texas
- SK Hynix (000660.KS), chip fab · 2 projects in Texas
- Caterpillar (CAT), power equipment · 2 projects in Texas
- Crusoe (CRUSOE), gpu cloud · 2 projects in Texas
- CoreWeave (CRWV), gpu cloud · 2 projects in Texas
- Emerson Electric (EMR), power equipment · 2 projects in Texas
- IREN (IREN), gpu cloud · 2 projects in Texas
- Meta Platforms (META), hyperscaler · 2 projects in Texas
- Micron Technology (MU), chip fab · 2 projects in Texas
- Oracle (ORCL), hyperscaler · 2 projects in Texas
- Powell Industries (POWL), power equipment · 2 projects in Texas
- Primoris Services (PRIM), construction · 2 projects in Texas
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Utah data centers, 14 tracked projects, 14.3 GW pipeline
- Virginia data centers, 94 tracked projects, 13.6 GW pipeline
- Ohio data centers, 48 tracked projects, 13.2 GW pipeline
- Georgia data centers, 47 tracked projects, 9.9 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Pennsylvania data centers, 26 tracked projects, 7.1 GW pipeline
- Kansas data centers, 11 tracked projects, 6.7 GW pipeline
- Illinois data centers, 15 tracked projects, 6.2 GW pipeline
- Florida data centers, 7 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.1 GW pipeline
- Oklahoma data centers, 13 tracked projects, 4.5 GW pipeline
- Missouri data centers, 10 tracked projects, 4 GW pipeline
- Arizona data centers, 31 tracked projects, 3.9 GW pipeline
- Alabama data centers, 10 tracked projects, 3.8 GW pipeline
- Nevada data centers, 16 tracked projects, 3.4 GW pipeline
- Maryland data centers, 6 tracked projects, 3.2 GW pipeline
- West Virginia data centers, 9 tracked projects, 2.9 GW pipeline
- Arkansas data centers, 8 tracked projects, 2.7 GW pipeline
- North Carolina data centers, 16 tracked projects, 2.3 GW pipeline
- North Dakota data centers, 14 tracked projects, 2.2 GW pipeline
- Michigan data centers, 11 tracked projects, 2.2 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 22 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- Iowa data centers, 22 tracked projects, 1.4 GW pipeline
- New York data centers, 9 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New Mexico data centers, 3 tracked projects, 1.3 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 8 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 5 tracked projects, 840 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- Mississippi data centers, 10 tracked projects, 500 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Minnesota data centers, 6 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- Washington data centers, 5 tracked projects