Cipher Digital
Tracked AI data center portfolio for Cipher Digital: live capex history, supplier exposure, and project map.
- Projects tracked: 3
- Total pipeline: 507 MW
Projects
- Cipher Black Pearl, 300 MW, Wink, TX, United States · under construction
- Cipher Odessa, 207 MW, Odessa, TX, United States · operational
- Cipher Reveille, Cotulla, TX, United States · announced
Frequently asked questions
- How many data centers does Cipher Digital have?
- Data Center Index tracks 3 data center campuses with Cipher Digital named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Cipher Digital have?
- 507 MW across 3 tracked campuses, counting operating and pipeline sites together. Of the 2 Cipher Digital campuses with a capacity figure, 2 are filed, 0 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Cipher Digital build data centers?
- Tracked Cipher Digital campuses sit in 1 market: TX (3). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Cipher Digital data center?
- Cipher Black Pearl in Wink, TX is the largest tracked Cipher Digital campus at 300 MW, currently under construction. A permit, utility filing or SEC filing states that capacity, in a source dated February 24, 2026.