Cipher Digital
Tracked AI data center portfolio for Cipher Digital: campuses, partners and project map.
- Projects tracked: 5
- Total pipeline: 700 MW
Projects
- Cipher Black Pearl, 216 MW, Winkler County, TX, United States · operational
- Cipher Barber Lake, 207 MW, Mitchell County, TX, United States · under construction
- Cipher Odessa, 207 MW, Odessa, TX, United States · operational
- Cipher Stingray, 70 MW, Andrews County, TX, United States · under construction
- Cipher Reveille, Cotulla, TX, United States · announced
Frequently asked questions
- How many data centers does Cipher Digital have?
- Data Center Index tracks 5 data center campuses with Cipher Digital named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Cipher Digital have?
- 700 MW across 5 tracked campuses, counting operating and pipeline sites together. Of the 4 Cipher Digital campuses with a capacity figure, 3 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Cipher Digital build data centers?
- Tracked Cipher Digital campuses sit in 1 market: TX (5). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Cipher Digital data center?
- Cipher Black Pearl in Winkler County, TX is the largest tracked Cipher Digital campus at 216 MW, currently operational. A permit, utility filing or SEC filing states that capacity, in a source dated February 3, 2026.