Soluna Holdings
Tracked AI data center portfolio for Soluna Holdings: live capex history, supplier exposure, and project map.
- Projects tracked: 2
- Total pipeline: 166 MW
Projects
- Soluna Project Kati, 166 MW, Willacy County, TX, United States · operational
- Soluna Project Dorothy, Briscoe County, TX, United States · operational
Frequently asked questions
- How many data centers does Soluna Holdings have?
- Data Center Index tracks 2 data center campuses with Soluna Holdings named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Soluna Holdings have?
- 166 MW across 2 tracked campuses, counting operating and pipeline sites together. Of the 1 Soluna Holdings campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Soluna Holdings build data centers?
- Tracked Soluna Holdings campuses sit in 1 market: TX (2). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Soluna Holdings data center?
- Soluna Project Kati in Willacy County, TX is the largest tracked Soluna Holdings campus at 166 MW, currently operational. The developer or the press states that capacity, in a source dated September 18, 2025.