Soluna Project Kati
166 MW AI data center in Lyford, TX, United States: operational.
Updated
- Capacity: 166 MW
- Location: Lyford, TX, United States
- Developer: Soluna Holdings
- Status: operational
Soluna Project Kati is a 166 MW AI data center project located in Lyford, TX, United States, currently operational. It was developed by Soluna Holdings. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Texas.
Project description
Soluna describes Project Kati as a 166 MW wind powered data center campus in Willacy County, Texas, built in two phases of 83 MW each, with the first phase energized in early 2026.
Related data center projects
- Soluna Project Dorothy, Silverton, TX, United States · operational
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Millard County, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Caldwell County, TX, United States · announced
Frequently asked questions
- What is Soluna Project Kati?
- Soluna Project Kati is an AI data center project in Lyford, Texas tracked by Data Center Index. Its status is operational.
- Where is Soluna Project Kati?
- Soluna Project Kati is in Lyford, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- How big is Soluna Project Kati?
- Data Center Index tracks Soluna Project Kati at 166 MW. 83 MW of that is live today. The developer or the press states that capacity, in a source dated September 18, 2025.
- Who is building Soluna Project Kati?
- Soluna Holdings is developing Soluna Project Kati.
Sources
- Project Kati FAQs (solunacomputing.com · press · 2025-09-18)
- Rio Grande Guardian (riograndeguardian.com · press · 2026-10-07)