AI data center in Briscoe County, TX, United States: operational.
- Location: Briscoe County, TX, United States
- Developer: Soluna Holdings
- Status: operational
Soluna Project Dorothy is a AI data center project located in Briscoe County, TX, United States, currently operational. It is being built by Soluna Holdings. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Soluna lists Dorothy 1A and 1B at 50 MW and Dorothy 2 at 48 MW, both operating, on its Briscoe County site next to the Briscoe wind farm. A third phase, Dorothy 3, is planned on 397 adjacent acres.
Related data center projects
- Soluna Project Kati, 166 MW, Willacy County, TX, United States · operational
- Stratos Hyperscale Data Center, 9 GW, Hansel Valley, UT, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
Frequently asked questions
- What is Soluna Project Dorothy?
- Soluna Project Dorothy is an AI data center project in Briscoe County, Texas tracked by Data Center Index. Its status is operational.
- Where is Soluna Project Dorothy?
- Soluna Project Dorothy is in Briscoe County, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- Who is building Soluna Project Dorothy?
- Soluna Holdings is developing Soluna Project Dorothy.