Nevada Data Centers
Live tracking of every data center project in Nevada — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 6
- Operating and expanding: 2
- Under construction: 3
- Announced: 1
- Operating capacity: 1.3 GW
- Pipeline capacity: 1.6 GW
- Grid: NV Energy
Nevada has two Henderson-area projects: Google's $6.1B, 389 MW Storey County campus is operating and Vantage's 224 MW NV1 AI data center is under construction. NV Energy supplies both.
Data Center Index tracks 10 named data center campuses in Nevada (large sites with a source, not every building): 6 operating, 3 under construction, and 1 announced or permitted. The pipeline adds up to 1.6 GW of planned capacity. The grid is operated by NV Energy, which runs the interconnection queue. Below: every tracked project in Nevada, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Nevada
- Google Storey County, McCarran · operational · developer: Google · ~$6.1B
- Switch Citadel Campus (Tahoe Reno) — 650 MW, McCarran · operational · developer: Switch
- Switch The Core Campus (Las Vegas) — 495 MW, Las Vegas · operational · developer: Switch
- Novva North Las Vegas — 100 MW, North Las Vegas · operational · developer: Novva Data Centers
- Novva Tahoe Reno — 60 MW, McCarran · operational · developer: Novva Data Centers
- Google Henderson, Henderson · operational · developer: Google
- Fleet Data Centers South Valley (TRIC) — 200 MW, McCarran · under construction · developer: Fleet Data Centers (Tract) · ~$4.6B
- Vantage Nevada AI Data Center (NV1) — 224 MW, McCarran · under construction · developer: Vantage Data Centers
- EdgeCore Reno (TRIC) — 216 MW, McCarran · under construction · developer: EdgeCore Digital Infrastructure
- Copia Power Monarch (Mason Valley) — 1.0 GW, Yerington · permitted · developer: Copia Power
Frequently asked questions
- How many data centers are in Nevada?
- Data Center Index tracks 10 named data center campuses in Nevada as of 2026: 6 operating, 3 under construction, and 1 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Nevada have?
- 1.3 GW is operating, with 1.6 GW in the announced and under-construction pipeline. 3 of the 8 Nevada campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in Nevada?
- Copia Power Monarch (Mason Valley) in Yerington is the largest tracked campus in Nevada at 1.0 GW, developed by Copia Power. That capacity is stated by a named source.
- Who is building data centers in Nevada?
- The most active developers in Nevada by tracked campus count are Google (2 campuses), Switch (2 campuses), Novva Data Centers (2 campuses). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Nevada data centers?
- NV Energy runs the grid and the interconnection queue for Nevada, so new campus power requests are approved on its timeline.
Public companies exposed to Nevada
These public companies have tracked data-center projects in Nevada as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Alphabet (GOOGL) — hyperscaler · 1 project in Nevada
- Vantage Data Centers (VANTAGE) — dc operator · 1 project in Nevada
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects