Nevada Data Centers
Live tracking of every data center project in Nevada (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 7
- Operating and expanding: 2
- Under construction: 5
- Announced: 4
- Operating capacity: 1.3 GW
- Pipeline capacity: 3.6 GW
- Grid: NV Energy
Nevada's data centers split between Las Vegas and the Tahoe Reno Industrial Center in Storey County. Switch runs its 650 MW Citadel campus at Tahoe Reno and The Core in Las Vegas, and the same industrial park has Vantage's 224 MW NV1, EdgeCore's 216 MW Reno campus and Fleet's 200 MW South Valley site under construction. Google operates in Storey County and Henderson, and Copia Power has a 1 GW Monarch project permitted near Yerington.
Data Center Index tracks 16 named data center campuses in Nevada (large sites with a source, not every building): 7 operating, 5 under construction, and 4 announced or permitted. The pipeline adds up to 3.6 GW of planned capacity. The grid is operated by NV Energy, which runs the interconnection queue. Below: every tracked project in Nevada, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Nevada
- Google Storey County, McCarran · operational · developer: Google · ~$0.6B
- Switch Citadel Campus (Tahoe Reno), 650 MW, McCarran · operational · developer: Switch
- Switch The Core Campus (Las Vegas), 495 MW, Las Vegas · operational · developer: Switch
- Novva North Las Vegas, 100 MW, North Las Vegas · operational · developer: Novva Data Centers
- Novva Tahoe Reno, 60 MW, McCarran · operational · developer: Novva Data Centers
- Google Henderson, Henderson · operational · developer: Google
- Apple Reno Data Center, Reno · operational · developer: Apple
- Vantage Nevada AI Data Center (NV1), 224 MW, McCarran · under construction · developer: Vantage Data Centers · ~$3B
- EdgeCore Reno (TRIC), 216 MW, McCarran · under construction · developer: EdgeCore Digital Infrastructure
- Fleet Data Centers South Valley (TRIC), 200 MW, McCarran · under construction · developer: Fleet Data Centers (Tract)
- Fleet Data Centers Peru Ridge (TRIC), 200 MW, McCarran · under construction · developer: Fleet Data Centers (Tract)
- PowerHouse Reno, 65 MW, McCarran · under construction · developer: PowerHouse Data Centers
- Switch Apex Campus (North Las Vegas), North Las Vegas · announced · developer: Switch
- Copia Power Monarch (Mason Valley), 1 GW, Yerington · permitted · developer: Copia Power · ~$8B
- Tract Peru Shelf Technology Park, 810 MW, McCarran · permitted · developer: Tract
- Tract Sapphire Technology Park, 700 MW, Silver Springs · permitted · developer: Tract
- Townsite Data Center, 167 MW, Boulder City · paused · developer: Skylar Capital Management
Frequently asked questions
- How many data centers are in Nevada?
- Data Center Index tracks 16 named data center campuses in Nevada as of 2026: 7 operating, 5 under construction, and 4 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Nevada have?
- 1.3 GW is operating, with 3.6 GW in the announced and under-construction pipeline. Of the 12 Nevada campuses with a capacity figure, 0 are filed, 10 stated and 2 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in Nevada?
- Copia Power Monarch (Mason Valley) in Yerington is the largest tracked campus in Nevada at 1 GW, developed by Copia Power. The developer or the press states that capacity, in a source dated August 10, 2026.
- Who is building data centers in Nevada?
- The most active developers in Nevada by tracked campus count are Switch (3 campuses), Google (2 campuses), Novva Data Centers (2 campuses). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Nevada data centers?
- NV Energy runs the grid and the interconnection queue for Nevada, so new campus power requests are approved on its timeline.
Public companies exposed to Nevada
These public companies have tracked data-center projects in Nevada as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Alphabet (GOOGL), hyperscaler · 1 project in Nevada
- Vantage Data Centers (VANTAGE), dc operator · 1 project in Nevada
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 107 tracked projects, 41.4 GW pipeline
- Utah data centers, 14 tracked projects, 14.3 GW pipeline
- Virginia data centers, 94 tracked projects, 13.6 GW pipeline
- Ohio data centers, 48 tracked projects, 13.2 GW pipeline
- Georgia data centers, 47 tracked projects, 9.9 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Pennsylvania data centers, 26 tracked projects, 7.1 GW pipeline
- Kansas data centers, 11 tracked projects, 6.7 GW pipeline
- Illinois data centers, 15 tracked projects, 6.2 GW pipeline
- Florida data centers, 7 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.1 GW pipeline
- Oklahoma data centers, 13 tracked projects, 4.5 GW pipeline
- Missouri data centers, 10 tracked projects, 4 GW pipeline
- Arizona data centers, 31 tracked projects, 3.9 GW pipeline
- Alabama data centers, 10 tracked projects, 3.8 GW pipeline
- Maryland data centers, 6 tracked projects, 3.2 GW pipeline
- West Virginia data centers, 9 tracked projects, 2.9 GW pipeline
- Arkansas data centers, 8 tracked projects, 2.7 GW pipeline
- North Carolina data centers, 16 tracked projects, 2.3 GW pipeline
- North Dakota data centers, 14 tracked projects, 2.2 GW pipeline
- Michigan data centers, 11 tracked projects, 2.2 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 22 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- Iowa data centers, 22 tracked projects, 1.4 GW pipeline
- New York data centers, 9 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New Mexico data centers, 3 tracked projects, 1.3 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 8 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 5 tracked projects, 840 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- Mississippi data centers, 10 tracked projects, 500 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Minnesota data centers, 6 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- Washington data centers, 5 tracked projects