Nevada Data Centers

Live tracking of every data center project in Nevada (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.

Nevada's data centers split between Las Vegas and the Tahoe Reno Industrial Center in Storey County. Switch runs its 650 MW Citadel campus at Tahoe Reno and The Core in Las Vegas, and the same industrial park has Vantage's 224 MW NV1, EdgeCore's 216 MW Reno campus and Fleet's 200 MW South Valley site under construction. Google operates in Storey County and Henderson, and Copia Power has a 1 GW Monarch project permitted near Yerington.

Data Center Index tracks 16 named data center campuses in Nevada (large sites with a source, not every building): 7 operating, 5 under construction, and 4 announced or permitted. The pipeline adds up to 3.6 GW of planned capacity. The grid is operated by NV Energy, which runs the interconnection queue. Below: every tracked project in Nevada, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.

Tracked data center projects in Nevada

Frequently asked questions

How many data centers are in Nevada?
Data Center Index tracks 16 named data center campuses in Nevada as of 2026: 7 operating, 5 under construction, and 4 announced or permitted. Coverage is named campuses with a published source, not every building.
How much data center capacity does Nevada have?
1.3 GW is operating, with 3.6 GW in the announced and under-construction pipeline. Of the 12 Nevada campuses with a capacity figure, 0 are filed, 10 stated and 2 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
What is the largest data center in Nevada?
Copia Power Monarch (Mason Valley) in Yerington is the largest tracked campus in Nevada at 1 GW, developed by Copia Power. The developer or the press states that capacity, in a source dated August 10, 2026.
Who is building data centers in Nevada?
The most active developers in Nevada by tracked campus count are Switch (3 campuses), Google (2 campuses), Novva Data Centers (2 campuses). Every campus page lists its developer, tenant and the source that names them.
Which grid operator serves Nevada data centers?
NV Energy runs the grid and the interconnection queue for Nevada, so new campus power requests are approved on its timeline.

Public companies exposed to Nevada

These public companies have tracked data-center projects in Nevada as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.

Other data center markets

Tracked US markets, ranked by pipeline capacity: