Tennessee Data Centers
Live tracking of every data center project in Tennessee — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 5
- Operating and expanding: 1
- Under construction: 1
- Announced: 1
- Operating capacity: 5.0 GW
- Pipeline capacity: 2.1 GW
Memphis is the reason Tennessee is on this list. xAI's Colossus campus is tracked at roughly 2 GW across the Greater Memphis program, with Colossus 1 at 425 MW and Colossus 2 at 2.07 GW, and Supermicro and Vertiv are among the linked suppliers. Elsewhere Google has a 500 MW Kairos-powered site announced at Oak Ridge, Meta operates 114 MW in Gallatin, and the Frontier supercomputer at Oak Ridge National Laboratory draws 24.6 MW.
Data Center Index tracks 7 named data center campuses in Tennessee (large sites with a source, not every building): 5 operating, 1 under construction, and 1 announced or permitted. The pipeline adds up to 2.1 GW of planned capacity. Below: every tracked project in Tennessee, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Tennessee
- Colossus 2 — 2.1 GW, Memphis · operational · developer: SpaceXAI · tenant: Anthropic · ~$35.8B
- Colossus 1 — 425 MW, Memphis · operational · developer: SpaceXAI · tenant: Anthropic · ~$12.9B
- Meta Gallatin — 300 MW, Gallatin · operational · developer: Meta · ~$3.3B
- xAI Colossus / MACROHARDRR Greater Memphis AI Campus — 2.0 GW, Memphis · operational · developer: xAI
- Centersquare (Evoque/Archer) Gallatin Campus — 100 MW, Gallatin · operational · developer: Centersquare (formerly Evoque) / Archer Datacenters
- Bitdeer Knoxville (Forks of the River) — 86 MW, Knoxville · operational · developer: Bitdeer Technologies
- Frontier Supercomputer — Oak Ridge National Laboratory — 25 MW, Oak Ridge · operational · developer: Oak Ridge National Laboratory
- Google Clarksville (Montgomery County) Data Center, Clarksville · operational · developer: Google
- 5C MEM01 Memphis (former Fred's HQ) — 60 MW, Memphis · under construction · developer: 5C Group
- Project River Energy Campus — 1.5 GW, Charleston · announced · developer: Wright Brothers Construction Company
- Google-Kairos Power AI Data Center Initiative — 500 MW, Oak Ridge · announced · developer: Google
- DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus — 50 MW, Nashville · announced · developer: DC BLOX
Frequently asked questions
- How many data centers are in Tennessee?
- Data Center Index tracks 7 named data center campuses in Tennessee as of 2026: 5 operating, 1 under construction, and 1 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Tennessee have?
- 5.0 GW is operating, with 2.1 GW in the announced and under-construction pipeline. 7 of the 9 Tennessee campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in Tennessee?
- xAI Colossus / MACROHARDRR Greater Memphis AI Campus in Memphis is the largest tracked campus in Tennessee at 2.0 GW, developed by xAI. That capacity is stated by a named source.
- Who is building data centers in Tennessee?
- The most active developers in Tennessee by tracked campus count are Google (2 campuses), Meta (1 campus), xAI (1 campus). Every campus page lists its developer, tenant and the source that names them.
Public companies exposed to Tennessee
These public companies have tracked data-center projects in Tennessee as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Super Micro Computer (SMCI) — it hardware · 2 projects in Tennessee
- SpaceXAI (SPCX) — ai lab · 2 projects in Tennessee
- Vertiv Holdings (VRT) — cooling · 2 projects in Tennessee
- SK Hynix (000660.KS) — chip fab · 1 project in Tennessee
- Advanced Micro Devices (AMD) — semiconductor · 1 project in Tennessee
- Anthropic (ANTHROPIC) — ai lab · 1 project in Tennessee
- Alphabet (GOOGL) — hyperscaler · 1 project in Tennessee
- Meta Platforms (META) — hyperscaler · 1 project in Tennessee
- Micron Technology (MU) — chip fab · 1 project in Tennessee
- Tesla (TSLA) — hyperscaler · 1 project in Tennessee
- Trane Technologies (TT) — cooling · 1 project in Tennessee
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects