Bitdeer Knoxville (Forks of the River)
73 MW AI data center in Knoxville, TN, United States — operational.
- Capacity: 73 MW
- Location: Knoxville, TN, United States
- Developer: Bitdeer Technologies
- Status: operational
Bitdeer Knoxville (Forks of the River) is a 73 MW AI data center project located in Knoxville, TN, United States, currently operational. It is being built by Bitdeer Technologies. This project is one of thousands of data-center facilities tracked by Data Center Index across TN, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Bitdeer's facility in the Forks of the River Industrial Park in South Knoxville is the largest data center on KUB's system, 'contracted to use up to 73 megawatts of electricity', running bitcoin mining and AI infrastructure.
Related data center projects
- Bitdeer Shalersville Campus (Turnpike Commerce Center) — 750 MW, Shalersville Township, OH, United States · announced
- Bitdeer Massillon Campus — 221 MW, Massillon (Perry Township), OH, United States · under construction
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced