Bitdeer Shalersville Campus (Turnpike Commerce Center)
750 MW AI data center in Shalersville Township, OH, United States: announced.
- Capacity: 750 MW
- Location: Shalersville Township, OH, United States
- Developer: Bitdeer Technologies
- Status: announced
- Estimated cost: $0.3B
Bitdeer Shalersville Campus (Turnpike Commerce Center) is a 750 MW AI data center project located in Shalersville Township, OH, United States, currently announced. It is being built by Bitdeer Technologies. The estimated build cost is $0.3B. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Bitdeer proposes a campus of about 257 acres at Turnpike Commerce Center. The first phase is 150 MW, with two 48,000 sq ft data halls plus an office, and it would scale to 750 MW over about 5 years at a cost of over $300M, not counting computing equipment. It isn't approved yet and falls under a local moratorium through early November 2026.
Related data center projects
- Bitdeer Massillon Campus, 221 MW, Massillon (Perry Township), OH, United States · operational
- Bitdeer Knoxville (Forks of the River), 86 MW, Knoxville, TN, United States · operational
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
Frequently asked questions
- What is Bitdeer Shalersville Campus (Turnpike Commerce Center)?
- Bitdeer Shalersville Campus (Turnpike Commerce Center) is an AI data center project in Shalersville Township, Ohio tracked by Data Center Index. Its status is announced.
- Where is Bitdeer Shalersville Campus (Turnpike Commerce Center)?
- Bitdeer Shalersville Campus (Turnpike Commerce Center) is in Shalersville Township, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
- How big is Bitdeer Shalersville Campus (Turnpike Commerce Center)?
- Data Center Index tracks Bitdeer Shalersville Campus (Turnpike Commerce Center) at 750 MW, on an estimated $0.3B build. The developer or the press states that capacity, in a source dated September 20, 2026.
- Who is building Bitdeer Shalersville Campus (Turnpike Commerce Center)?
- Bitdeer Technologies is developing Bitdeer Shalersville Campus (Turnpike Commerce Center).
Sources
- Bitdeer looks to develop 750MW data center campus in Ohio (datacenterdynamics.com · press · 2026-06-16)
- News 5 Cleveland (WEWS) (news5cleveland.com · press · 2026-06-16)
- Bitdeer's 750MW Ohio AI Data Center Plan Draws Local Pushback (theenergymag.com · press · 2026-06-17)
- News 5 Cleveland (news5cleveland.com · press · 2026-05-27)
- News 5 Cleveland (news5cleveland.com · press · 2026-10-06)
- The Portager (theportager.com · press · 2026-06-16)