Bitdeer Technologies (BTDR)

Bitcoin miner and mining-rig maker, spun out of Bitmain, that also runs an NVIDIA-based AI cloud and is converting sites in the US and Norway for HPC and AI use.

Projects

Frequently asked questions

How many data centers does Bitdeer Technologies have?
Data Center Index tracks 5 data center campuses with Bitdeer Technologies named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Bitdeer Technologies have?
1.9 GW across 5 tracked campuses, counting operating and pipeline sites together. Of the 5 Bitdeer Technologies campuses with a capacity figure, 1 is filed, 2 stated and 2 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Bitdeer Technologies build data centers?
Tracked Bitdeer Technologies campuses sit in 2 markets: OH (4), TN (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Bitdeer Technologies data center?
Bitdeer Shalersville Campus (Turnpike Commerce Center) in Portage County, OH is the largest tracked Bitdeer Technologies campus at 750 MW, currently announced. The developer or the press states that capacity, in a source dated September 20, 2026.

Profile sources