Bitdeer Weathersfield Site (Niles)
300 MW AI data center in Weathersfield Township, OH, United States: announced.
- Capacity: 300 MW
- Location: Weathersfield Township, OH, United States
- Developer: Bitdeer Technologies
- Status: announced
Bitdeer Weathersfield Site (Niles) is a 300 MW AI data center project located in Weathersfield Township, OH, United States, currently announced. It is being built by Bitdeer Technologies. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Bitdeer is developing a 300 MW grid-connected AI cloud and colocation site on 41.8 acres it owns at the former Ohio Edison power plant on Belmont Avenue in Weathersfield Township near Niles, targeting energization in the fourth quarter of 2028.
Related data center projects
- Bitdeer Shalersville Campus (Turnpike Commerce Center), 750 MW, Shalersville Township, OH, United States · announced
- Bitdeer Clarington Site, 570 MW, Clarington, OH, United States · announced
- Bitdeer Massillon Campus, 221 MW, Massillon (Perry Township), OH, United States · operational
- Bitdeer Knoxville (Forks of the River), 86 MW, Knoxville, TN, United States · operational
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
Frequently asked questions
- What is Bitdeer Weathersfield Site (Niles)?
- Bitdeer Weathersfield Site (Niles) is an AI data center project in Weathersfield Township, Ohio tracked by Data Center Index. Its status is announced.
- Where is Bitdeer Weathersfield Site (Niles)?
- Bitdeer Weathersfield Site (Niles) is in Weathersfield Township, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
- How big is Bitdeer Weathersfield Site (Niles)?
- Data Center Index tracks Bitdeer Weathersfield Site (Niles) at 300 MW. A permit, utility filing or SEC filing states that capacity, in a source dated August 10, 2026.
- Who is building Bitdeer Weathersfield Site (Niles)?
- Bitdeer Technologies is developing Bitdeer Weathersfield Site (Niles).
- When will Bitdeer Weathersfield Site (Niles) come online?
- The next building at Bitdeer Weathersfield Site (Niles) is expected online 2028. That date is the first building going live, not the full build-out.
Sources
- Bitdeer Reports Unaudited Financial Results for the Second Quarter of 2026 (Form 6-K Exhibit 99.1) (sec.gov · filing · 2026-08-10)
- WKBN (yahoo.com · press · 2026-08-10)