Bitdeer Massillon Campus
221 MW AI data center in Massillon (Perry Township), OH, United States: operational.
- Capacity: 221 MW
- Location: Massillon (Perry Township), OH, United States
- Developer: Bitdeer Technologies
- Status: operational
Bitdeer Massillon Campus is a 221 MW AI data center project located in Massillon (Perry Township), OH, United States, currently operational. It is being built by Bitdeer Technologies. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Bitdeer's 221 MW Massillon facility is described as under development, though a fire damaged two buildings at the construction site in November 2025. The Canton Repository reported on 2026-06-02 that the 221 MW site will be Stark County's largest data center once it's complete.
Related data center projects
- Bitdeer Shalersville Campus (Turnpike Commerce Center), 750 MW, Shalersville Township, OH, United States · announced
- Bitdeer Knoxville (Forks of the River), 86 MW, Knoxville, TN, United States · operational
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
Frequently asked questions
- What is Bitdeer Massillon Campus?
- Bitdeer Massillon Campus is an AI data center project in Massillon (Perry Township), Ohio tracked by Data Center Index. Its status is operational.
- Where is Bitdeer Massillon Campus?
- Bitdeer Massillon Campus is in Massillon (Perry Township), Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
- How big is Bitdeer Massillon Campus?
- Data Center Index tracks Bitdeer Massillon Campus at 221 MW. 174 MW of that is live today. The developer or the press states that capacity, in a source dated August 13, 2025.
- Who is building Bitdeer Massillon Campus?
- Bitdeer Technologies is developing Bitdeer Massillon Campus.
Sources
- Bitdeer looks to develop 750MW data center campus in Ohio (datacenterdynamics.com · press · 2026-06-16)
- Bitdeer Technologies Group (SEC Form 6-K, June 2026 operations update) (sec.gov · filing · 2026-07-21)
- Bitdeer Technologies (globenewswire.com · press · 2025-08-13)
- Bitdeer (SEC 6-K ex99-1) (sec.gov · filing · 2026-07-21)
- Bitdeer Announces February 2026 Production and Operations Update (Form 6-K Ex. 99.1) (sec.gov · filing · 2026-03-16)
- Canton Repository via AOL (aol.com · press · 2026-10-07)
- Bitdeer Technologies Group (Form 6-K, Q2 2026 results) (sec.gov · filing · 2026-08-10)
- Canton Repository (via AOL) (aol.com · press · 2026-07-21)
- News 5 Cleveland (news5cleveland.com · press · 2026-08-10)