Bitdeer Massillon Campus
221 MW AI data center in Massillon (Perry Township), OH, United States — under construction.
- Capacity: 221 MW
- Location: Massillon (Perry Township), OH, United States
- Developer: Bitdeer Technologies
- Status: under construction
Bitdeer Massillon Campus is a 221 MW AI data center project located in Massillon (Perry Township), OH, United States, currently under construction. It is being built by Bitdeer Technologies. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Bitdeer's 221 MW Massillon facility is described as under development (a fire damaged two buildings at the construction site in November 2025); Canton Repository (2026-06-02) says the 221 MW site will be Stark County's largest data center once complete.
Related data center projects
- Bitdeer Shalersville Campus (Turnpike Commerce Center) — 750 MW, Shalersville Township, OH, United States · announced
- Bitdeer Knoxville (Forks of the River) — 73 MW, Knoxville, TN, United States · operational
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced