TN AI Data Center Projects
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
- Projects tracked: 12
- Operating: 8
- Under construction: 1
- Announced / permitted: 3
- Total capacity: 7.1 GW
- Estimated investment: ~$52.0B
-
Colossus 2 — 2.1 GW, Memphis, TN, United States · developer: SpaceXAI · tenant: Anthropic · operational · ~$35.8B
-
xAI Colossus / MACROHARDRR Greater Memphis AI Campus — 2.0 GW, Memphis, TN, United States · developer: xAI · operational
-
Project River Energy Campus — 1.5 GW, Charleston, TN, United States · developer: Wright Brothers Construction Company · announced
-
Google-Kairos Power AI Data Center Initiative — 500 MW, Oak Ridge, TN, United States · developer: Google · announced
-
Colossus 1 — 425 MW, Memphis, TN, United States · developer: SpaceXAI · tenant: Anthropic · operational · ~$12.9B
-
Meta Gallatin — 300 MW, Gallatin, TN, United States · developer: Meta · operational · ~$3.3B
-
Centersquare (Evoque/Archer) Gallatin Campus — 100 MW, Gallatin, TN, United States · developer: Centersquare (formerly Evoque) / Archer Datacenters · operational
-
Bitdeer Knoxville (Forks of the River) — 86 MW, Knoxville, TN, United States · developer: Bitdeer Technologies · operational
-
5C MEM01 Memphis (former Fred's HQ) — 60 MW, Memphis, TN, United States · developer: 5C Group · under construction
-
DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus — 50 MW, Nashville, TN, United States · developer: DC BLOX · announced
-
Frontier Supercomputer — Oak Ridge National Laboratory — 25 MW, Oak Ridge, TN, United States · developer: Oak Ridge National Laboratory · operational
-
Google Clarksville (Montgomery County) Data Center, Clarksville, TN, United States · developer: Google · operational