DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus
10 MW AI data center in Nashville, TN, United States: announced.
- Capacity: 10 MW
- Location: Nashville, TN, United States
- Developer: DC BLOX
- Status: announced
- Estimated cost: $0.4B
DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus is a 10 MW AI data center project located in Nashville, TN, United States, currently announced. It is being built by DC BLOX. The estimated build cost is $0.4B. This project is one of thousands of data-center facilities tracked by Data Center Index across TN, United States, covering operational, under-construction, announced, and permitted sites.
Project description
DC BLOX has scaled its campus near the Nashville Zoo down to a single 69,200 sq ft building drawing 10 MW, dropping the second, larger 261,000 sq ft building at 40 MW that it had also listed. The capital investment on its own site fell from $1.9 billion for two buildings to $380 million for one, and the company says it is still working through the size and scope of the project.
Related data center projects
- DC BLOX Atlanta West (Douglasville), 200 MW, Douglasville, GA, United States · under construction
- DC BLOX Conyers AI Campus, 154 MW, Conyers, GA, United States · under construction
- DC BLOX Indianapolis East Side Campus, 52 MW, Indianapolis (Warren Township), IN, United States · permitted
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
Frequently asked questions
- What is DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus?
- DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus is an AI data center project in Nashville, Tennessee tracked by Data Center Index. Its status is announced.
- Where is DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus?
- DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus is in Nashville, Tennessee. Every tracked Tennessee campus, with counts and capacity, is at https://datacenterindex.ai/markets/tennessee.
- How big is DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus?
- Data Center Index tracks DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus at 10 MW, on an estimated $0.4B build. The developer or the press states that capacity, in a source dated October 7, 2026.
- Who is building DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus?
- DC BLOX is developing DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus.
Sources
- Your guide to data centers in Tennessee and how they could affect you (yahoo.com · press · 2026-07-07)
- WSMV (wsmv.com · press · 2026-08-12)
- DC BLOX (dcblox.com · press · 2026-10-07)
- NewsChannel 5 (WTVF) (newschannel5.com · press · 2026-07-21)