DC BLOX Atlanta West (Douglasville)
180 MW AI data center in Lithia Springs, GA, United States — under construction.
- Capacity: 180 MW
- Location: Lithia Springs, GA, United States
- Developer: DC BLOX
- Status: under construction
- Estimated cost: $1.2B
DC BLOX Atlanta West (Douglasville) is a 180 MW AI data center project located in Lithia Springs, GA, United States, currently under construction. It is being built by DC BLOX. The estimated build cost is $1.2B. This project is one of thousands of data-center facilities tracked by Data Center Index across GA, United States — covering operational, under-construction, announced, and permitted sites.
Project description
DC BLOX bought 55 acres on North River Road and started construction of a 180 MW, 750,000-sq-ft two-story campus of twelve data halls. On Sept 8, 2026 Douglasville approved $53M+ in incentives for phase 2, a combined 120 MW (80 MW + 40 MW buildings) costing $739M and due 2029, within a $1.2B campus (Douglas County Sentinel).
Related data center projects
- DC BLOX — Conyers AI Campus — 216 MW, Conyers, GA, United States · under construction
- DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus — 50 MW, Nashville, TN, United States · announced
- DC BLOX Indianapolis East Side Campus, Indianapolis (Warren Township), IN, United States · permitted
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction