Colossus 2
AI data center in Memphis, TN, United States: operational.
Updated
- Location: Memphis, TN, United States
- Developer: SpaceXAI
- Tenant: Anthropic
- Status: operational
- Estimated cost: $35.8B
- Energy source: Gas-fired (mobile generators & power plant)
Colossus 2 is an AI data center project located in Memphis, TN, United States, currently operational. It was developed by SpaceXAI for tenant Anthropic. The estimated build cost is $35.8B. Its energy source is listed as Gas-fired (mobile generators & power plant). Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Tennessee.
Notes
Users: Anthropic, Cursor, SpaceXAI; Epoch 'Current power' = 946 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Colossus 2
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- SpaceXAI (SPCX), developer · ai lab
- Anthropic (ANTHROPIC), tenant · ai lab
- SpaceXAI (SPCX), tenant · ai lab
- Vertiv Holdings (VRT), liquid cooling · cooling · high DC exposure
- NVIDIA (NVDA), GPU supplier · semiconductor
- Super Micro Computer (SMCI), ai server · it hardware · high DC exposure
- Tesla (TSLA), energy storage · hyperscaler · low DC exposure
Related data center projects
- Colossus 1, 340 MW, Memphis, TN, United States · operational
- xAI Memphis Area Compute Program (Colossus and MACROHARDRR), Memphis, TN, United States · operational
- xAI MACROHARDRR Southaven, Southaven, MS, United States · under construction
- SpaceXAI Tulane Road Data Center (Southaven), Southaven, MS, United States · permitted
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Cochise Supercomputer Campus, 6 GW, Cochise, AZ, United States · announced
Frequently asked questions
- What is Colossus 2?
- Colossus 2 is an AI data center project in Memphis, Tennessee tracked by Data Center Index. Its status is operational.
- Where is Colossus 2?
- Colossus 2 is in Memphis, Tennessee. Every tracked Tennessee campus, with counts and capacity, is at https://datacenterindex.ai/markets/tennessee.
- Who is building Colossus 2?
- SpaceXAI is developing Colossus 2, with Anthropic named as the tenant.
- Which public companies are linked to Colossus 2?
- Data Center Index links 7 tracked public companies to Colossus 2: SpaceXAI (SPCX), Anthropic (ANTHROPIC), SpaceXAI (SPCX), Vertiv Holdings (VRT), NVIDIA (NVDA), and 2 more. Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Epoch AI Frontier Data Centers (epoch · aggregator · 2026-04-29)
- SpaceXAI's Colossus data center is fueling a massive backlash (scientificamerican.com · press · 2026-09-09)
- Techzine Global (techzine.eu · press · 2025-12-31)
- MLGW update on utility support for xAI (mlgw.com · press · 2025-05-05)
- Space Exploration Technologies Corp. final prospectus (sec.gov · filing · 2026-06-12)
- Mississippi Permit Board Grants xAI's Request for 41 Southaven Gas Turbines to Power Memphis Data Center (mississippifreepress.org · press · 2026-03-10)
- finviz.com (press · 2026-09-25)
- Tom Brown (Anthropic), X (x.com · press · 2026-09-09)
- SiliconANGLE (siliconangle.com · press · 2025-12-31)
- SpaceX 10-Q (Q2 2026) (sec.gov · filing · 2026-06-12)