Colossus 2

AI data center in Memphis, TN, United States: operational.

Updated

Colossus 2 is an AI data center project located in Memphis, TN, United States, currently operational. It was developed by SpaceXAI for tenant Anthropic. The estimated build cost is $35.8B. Its energy source is listed as Gas-fired (mobile generators & power plant). Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Tennessee.

Notes

Users: Anthropic, Cursor, SpaceXAI; Epoch 'Current power' = 946 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI

Public companies linked to Colossus 2

Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:

Related data center projects

Frequently asked questions

What is Colossus 2?
Colossus 2 is an AI data center project in Memphis, Tennessee tracked by Data Center Index. Its status is operational.
Where is Colossus 2?
Colossus 2 is in Memphis, Tennessee. Every tracked Tennessee campus, with counts and capacity, is at https://datacenterindex.ai/markets/tennessee.
Who is building Colossus 2?
SpaceXAI is developing Colossus 2, with Anthropic named as the tenant.
Which public companies are linked to Colossus 2?
Data Center Index links 7 tracked public companies to Colossus 2: SpaceXAI (SPCX), Anthropic (ANTHROPIC), SpaceXAI (SPCX), Vertiv Holdings (VRT), NVIDIA (NVDA), and 2 more. Each is a developer, tenant or supplier with a sourced link to the project.

Sources

  1. Epoch AI Frontier Data Centers (epoch · aggregator · 2026-04-29)
  2. SpaceXAI's Colossus data center is fueling a massive backlash (scientificamerican.com · press · 2026-09-09)
  3. Techzine Global (techzine.eu · press · 2025-12-31)
  4. MLGW update on utility support for xAI (mlgw.com · press · 2025-05-05)
  5. Space Exploration Technologies Corp. final prospectus (sec.gov · filing · 2026-06-12)
  6. Mississippi Permit Board Grants xAI's Request for 41 Southaven Gas Turbines to Power Memphis Data Center (mississippifreepress.org · press · 2026-03-10)
  7. finviz.com (press · 2026-09-25)
  8. Tom Brown (Anthropic), X (x.com · press · 2026-09-09)
  9. SiliconANGLE (siliconangle.com · press · 2025-12-31)
  10. SpaceX 10-Q (Q2 2026) (sec.gov · filing · 2026-06-12)