- Projects tracked: 7
- Total pipeline: 10.6 GW
Projects
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- AWS Project Rainier (New Carlisle), 2.2 GW, St. Joseph County, IN, United States · operational
- TeraWulf Justified Data Campus, 401 MW, Hawesville, KY, United States · announced
- Colossus 1, 340 MW, Memphis, TN, United States · operational
- Colossus 2, Memphis, TN, United States · operational
- Amazon Madison Mega Site, Madison County, MS, United States · operational
- Monarch Compute Campus, Mason County, WV, United States · under construction
Frequently asked questions
- How many data centers does Anthropic have?
- Data Center Index tracks 7 data center campuses with Anthropic named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Anthropic have?
- 10.6 GW across 7 tracked campuses, counting operating and pipeline sites together. Of the 4 Anthropic campuses with a capacity figure, 0 are filed, 1 stated and 3 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Anthropic build data centers?
- Tracked Anthropic campuses sit in 6 markets: TN (2), IN (1), KY (1), MS (1), TX (1), WV (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Anthropic data center?
- Nexus Hubbard Campus in Hill County, TX is the largest tracked Anthropic campus at 7.7 GW, currently under construction. That capacity is an estimate. We modeled or inferred it, and no source states it.