TeraWulf Justified Data Campus
401 MW AI data center in Hawesville, KY, United States: announced.
Updated
- Capacity: 401 MW
- Location: Hawesville, KY, United States
- Developer: TeraWulf
- Tenant: Anthropic
- Status: announced
- Estimated cost: $4B
- Energy source: grid
TeraWulf Justified Data Campus is a 401 MW AI data center project located in Hawesville, KY, United States, currently announced. It is being built by TeraWulf for tenant Anthropic. The estimated build cost is $4B. The site is grid-powered. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Kentucky.
Notes
20-year Anthropic lease, ~$19B contracted revenue. Kentucky PSC approved 482 MW RESA 2026-08-24.
Public companies linked to TeraWulf Justified Data Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- TeraWulf (WULF), developer · dc operator
- Anthropic (ANTHROPIC), tenant · ai lab
Related data center projects
- TeraWulf Muskie Data Campus, 1 GW, Boyd County, KY, United States · announced
- TeraWulf Chesapeake Data Campus (Morgantown Generating Station), 800 MW, Charles County, MD, United States · announced
- TeraWulf Lake Mariner Campus, 600 MW, Somerset, NY, United States · operational
- TeraWulf Cayuga Data Campus (Lake Hawkeye), 320 MW, Lansing, NY, United States · paused
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Cochise Supercomputer Campus, 6 GW, Cochise, AZ, United States · announced
Frequently asked questions
- What is TeraWulf Justified Data Campus?
- TeraWulf Justified Data Campus is an AI data center project in Hawesville, Kentucky tracked by Data Center Index. Its status is announced.
- Where is TeraWulf Justified Data Campus?
- TeraWulf Justified Data Campus is in Hawesville, Kentucky. Every tracked Kentucky campus, with counts and capacity, is at https://datacenterindex.ai/markets/kentucky.
- How big is TeraWulf Justified Data Campus?
- Data Center Index tracks TeraWulf Justified Data Campus at 401 MW, on an estimated $4B build. The developer or the press states that capacity, in a source dated July 7, 2026.
- Who is building TeraWulf Justified Data Campus?
- TeraWulf is developing TeraWulf Justified Data Campus, with Anthropic named as the tenant.
- When will TeraWulf Justified Data Campus come online?
- The next building at TeraWulf Justified Data Campus is expected online December 31, 2027. That date is the first building going live, not the full build-out.
- Which public companies are linked to TeraWulf Justified Data Campus?
- Data Center Index links 2 tracked public companies to TeraWulf Justified Data Campus: TeraWulf (WULF), Anthropic (ANTHROPIC). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- W.Media (press · 2026-07-07)
- Press / filing (investors.terawulf.com · press · 2026-07-06)
- finance.yahoo.com (press · 2026-07-10)
- WEKU (weku.org · press · 2026-10-07)
- GlobeNewswire (TeraWulf release) (globenewswire.com · press · 2026-07-06)
- CNBC (cnbc.com · press · 2026-07-06)