Updated
- Operating: 5
- Under construction: 0
- Announced: 8
- Operating capacity: 160 MW
- Pipeline capacity: 8.3 GW
- Grid: MISO
Each count is a campus: one site, which can hold several buildings. How we count
Rubix plans 2 GW at the former AK Steel works in Russell, the largest of Kentucky's proposed campuses. TeraWulf has announced its 1 GW Muskie campus in Ashland and the 401 MW Justified campus in Hawesville with Anthropic as tenant, and PowerHouse holds a permit for a 400 MW hyperscale campus in southwest Louisville.
Data Center Index tracks 13 named data center campuses in Kentucky (large sites with a source, not every building): 5 operating, 0 under construction, and 8 announced or permitted. The pipeline adds up to 8.3 GW of planned capacity. The grid is operated by MISO, which runs the interconnection queue. Below: every tracked project in Kentucky, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Need Kentucky checked for a deal? A Campus Check covers every campus in your deal or market, up to about 25, with power status and the record behind each figure, in 3 business days for $2,500. A Team licence is $7,500 a year for up to 5 people. See prices.
Tracked data center projects in Kentucky
- Core Scientific Calvert City Campus Calvert City, 150 MW, Calvert City · operational · developer: Core Scientific
- CyrusOne CIN6 Florence, 5 MW, Florence · operational · developer: CyrusOne
- Flexential Louisville Downtown, 3 MW, Louisville · operational · developer: Flexential
- Flexential Louisville East, 1 MW, Louisville · operational · developer: Flexential
- Riot Platforms Kentucky Bitcoin Mining Facilities Paducah, Paducah · operational · developer: Riot Platforms
- DOE Paducah Site Data Center Campus, 1.2 GW, McCracken County · announced · developer: Brookfield · ~$100B
- Rubix Russell Data Center (former AK Steel Ashland Works), 2 GW, Russell · announced · developer: Rubix Data Centers · ~$12B
- PowerHouse Carrollton Industrial Campus, 800 MW, Carroll County · announced · developer: PowerHouse Data Centers · ~$9.6B
- Cave Point Commerce Center, 1.2 GW, Cave City · announced · developer: Kentucky Industrial Alliance · ~$4.8B
- TeraWulf Muskie Data Campus, 1 GW, Boyd County · announced · developer: TeraWulf · ~$4B
- TeraWulf Justified Data Campus, 401 MW, Hawesville · announced · developer: TeraWulf · tenant: Anthropic · ~$4B
- Project Bluegrass, 1.3 GW, Mercer County · announced · developer: Panattoni Data Centers · ~$1B
- PowerHouse Southwest Louisville Hyperscale Campus, 400 MW, Louisville · permitted · developer: PowerHouse Data Centers · ~$11B
Frequently asked questions
- How many data centers are in Kentucky?
- Data Center Index tracks 13 named data center campuses in Kentucky as of 2026: 5 operating, 0 under construction, and 8 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Kentucky have?
- 160 MW is operating, with 8.3 GW in the announced and under-construction pipeline. Of the 12 Kentucky campuses with a capacity figure, 0 are filed, 6 stated and 6 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in Kentucky?
- Rubix Russell Data Center (former AK Steel Ashland Works) in Russell is the largest tracked campus in Kentucky at 2 GW, developed by Rubix Data Centers. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building data centers in Kentucky?
- The most active developers in Kentucky by tracked campus count are Flexential (2 campuses), PowerHouse Data Centers (2 campuses), TeraWulf (2 campuses). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Kentucky data centers?
- MISO runs the grid and the interconnection queue for Kentucky, so new campus power requests are approved on its timeline.
Public companies exposed to Kentucky
These public companies have tracked data-center projects in Kentucky as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- TeraWulf (WULF), dc operator · 2 projects in Kentucky
- Anthropic (ANTHROPIC), ai lab · 1 project in Kentucky
- Core Scientific (CORZ), dc operator · 1 project in Kentucky
- NextEra Energy (NEE), energy · 1 project in Kentucky
- Riot Platforms (RIOT), dc operator · 1 project in Kentucky
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 174 tracked projects, 43.4 GW pipeline
- Virginia data centers, 190 tracked projects, 18.5 GW pipeline
- Utah data centers, 19 tracked projects, 13.8 GW pipeline
- Ohio data centers, 67 tracked projects, 11.8 GW pipeline
- Georgia data centers, 74 tracked projects, 11.4 GW pipeline
- Pennsylvania data centers, 46 tracked projects, 11.1 GW pipeline
- Arizona data centers, 49 tracked projects, 9.9 GW pipeline
- Illinois data centers, 51 tracked projects, 7.9 GW pipeline
- Kansas data centers, 15 tracked projects, 7.1 GW pipeline
- Nevada data centers, 22 tracked projects, 6 GW pipeline
- Florida data centers, 29 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 9 tracked projects, 5.5 GW pipeline
- Oklahoma data centers, 16 tracked projects, 4.5 GW pipeline
- Missouri data centers, 21 tracked projects, 4 GW pipeline
- Wyoming data centers, 9 tracked projects, 3.4 GW pipeline
- Alabama data centers, 13 tracked projects, 3.2 GW pipeline
- Indiana data centers, 30 tracked projects, 3.2 GW pipeline
- Maryland data centers, 10 tracked projects, 3 GW pipeline
- West Virginia data centers, 9 tracked projects, 2.9 GW pipeline
- Arkansas data centers, 9 tracked projects, 2.7 GW pipeline
- Iowa data centers, 29 tracked projects, 2.4 GW pipeline
- North Carolina data centers, 26 tracked projects, 2.3 GW pipeline
- North Dakota data centers, 14 tracked projects, 2.2 GW pipeline
- Michigan data centers, 16 tracked projects, 2.2 GW pipeline
- Oregon data centers, 25 tracked projects, 1.7 GW pipeline
- California data centers, 70 tracked projects, 1.7 GW pipeline
- South Carolina data centers, 11 tracked projects, 1.5 GW pipeline
- New York data centers, 19 tracked projects, 1.4 GW pipeline
- New Mexico data centers, 5 tracked projects, 1.3 GW pipeline
- Colorado data centers, 27 tracked projects, 1.2 GW pipeline
- Wisconsin data centers, 14 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 6 tracked projects, 840 MW pipeline
- Mississippi data centers, 10 tracked projects, 500 MW pipeline
- South Dakota data centers, 4 tracked projects, 500 MW pipeline
- Nebraska data centers, 10 tracked projects, 403 MW pipeline
- Minnesota data centers, 18 tracked projects, 378 MW pipeline
- New Jersey data centers, 24 tracked projects, 250 MW pipeline
- Connecticut data centers, 2 tracked projects, 100 MW pipeline
- Tennessee data centers, 16 tracked projects, 10 MW pipeline
- District of Columbia data centers, 2 tracked projects
- Hawaii data centers, 2 tracked projects
- Maine data centers, 1 tracked project
- Massachusetts data centers, 13 tracked projects
- Washington data centers, 22 tracked projects