Flexential
Tracked AI data center portfolio for Flexential: campuses, partners and project map.
- Projects tracked: 2
- Total pipeline: 131 MW
Projects
- Flexential Talty Campus, 108 MW, Talty, TX, United States · announced
- Flexential Denver-Parker Data Center, 23 MW, Parker, CO, United States · under construction
Frequently asked questions
- How many data centers does Flexential have?
- Data Center Index tracks 2 data center campuses with Flexential named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Flexential have?
- 131 MW across 2 tracked campuses, counting operating and pipeline sites together. Of the 2 Flexential campuses with a capacity figure, 0 are filed, 2 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Flexential build data centers?
- Tracked Flexential campuses sit in 2 markets: CO (1), TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Flexential data center?
- Flexential Talty Campus in TX is the largest tracked Flexential campus at 108 MW, currently announced. The developer or the press states that capacity, in a source dated July 28, 2026.