Flexential Denver-Parker Data Center
23 MW AI data center in Parker, CO, United States: under construction.
- Capacity: 23 MW
- Location: Parker, CO, United States
- Developer: Flexential
- Status: under construction
- Estimated cost: $0.2B
Flexential Denver-Parker Data Center is a 23 MW AI data center project located in Parker, CO, United States, currently under construction. It is being built by Flexential. The estimated build cost is $0.2B. This project is one of thousands of data-center facilities tracked by Data Center Index across CO, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Checked 2026-11-05 (fetched): Flexential is building a 249,000 sq ft, 22.5 MW data center on 17 acres on Compark Boulevard in Parker and expects to invest about $205 million. PCL topped it out in March 2026 and says construction finishes in summer 2027 (Mile High CRE, 2026-03-17).
Related data center projects
- Flexential Talty Campus, 108 MW, Talty, TX, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Millard County, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Caldwell County, TX, United States · announced
Frequently asked questions
- What is Flexential Denver-Parker Data Center?
- Flexential Denver-Parker Data Center is an AI data center project in Parker, Colorado tracked by Data Center Index. Its status is under construction.
- Where is Flexential Denver-Parker Data Center?
- Flexential Denver-Parker Data Center is in Parker, Colorado. Every tracked Colorado campus, with counts and capacity, is at https://datacenterindex.ai/markets/colorado.
- How big is Flexential Denver-Parker Data Center?
- Data Center Index tracks Flexential Denver-Parker Data Center at 23 MW, on an estimated $0.2B build. The developer or the press states that capacity, in a source dated August 11, 2026.
- Who is building Flexential Denver-Parker Data Center?
- Flexential is developing Flexential Denver-Parker Data Center.
- When will Flexential Denver-Parker Data Center come online?
- The next building at Flexential Denver-Parker Data Center is expected online 2027. That date is the first building going live, not the full build-out.
Sources
- Parker data center could get $19M tax rebate from Douglas County (coloradopolitics.com · press · 2026-08-11)
- Mile High CRE (milehighcre.com · press · 2026-08-11)