Kentucky Industrial Alliance
Tracked AI data center portfolio for Kentucky Industrial Alliance: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 1.2 GW
Projects
- Cave Point Commerce Center, 1.2 GW, Cave City, KY, United States · announced
Frequently asked questions
- How many data centers does Kentucky Industrial Alliance have?
- Data Center Index tracks 1 data center campus with Kentucky Industrial Alliance named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Kentucky Industrial Alliance have?
- 1.2 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Kentucky Industrial Alliance campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Kentucky Industrial Alliance build data centers?
- Tracked Kentucky Industrial Alliance campuses sit in 1 market: KY (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Kentucky Industrial Alliance data center?
- Cave Point Commerce Center in Cave City, KY is the largest tracked Kentucky Industrial Alliance campus at 1.2 GW, currently announced. The developer or the press states that capacity, in a source dated June 10, 2026.