North Carolina Data Centers
Live tracking of every data center project in North Carolina — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 4
- Under construction: 5
- Announced: 6
- Operating capacity: 691 MW
- Pipeline capacity: 4.1 GW
- Grid: Duke Energy
North Carolina's biggest build is AWS's 1 GW campus under construction in Richmond County. Meta operates 200 MW in Forest City, Apple runs a 200 MW Private Cloud Compute site in Maiden, CoreWeave has a 91 MW site in Marble that serves OpenAI, and Google has a $1B expansion announced in Lenoir. Duke Energy is the utility for all five.
Data Center Index tracks 15 named data center campuses in North Carolina (large sites with a source, not every building): 4 operating, 5 under construction, and 6 announced or permitted. The pipeline adds up to 4.1 GW of planned capacity. The grid is operated by Duke Energy, which runs the interconnection queue. Below: every tracked project in North Carolina, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in North Carolina
- CoreWeave Marble NC — 91 MW, Marble · operational · developer: Core Scientific · tenant: CoreWeave · ~$2.5B
- Apple Private Cloud Compute — AI Inference Infrastructure — 200 MW, Maiden · operational · developer: Apple
- Meta — Forest City, North Carolina AI Data Center Campus — 200 MW, Forest City · operational · developer: Meta
- WhiteFiber NC-1 Madison AI Data Center Campus — 200 MW, Madison · operational · developer: WhiteFiber (Bit Digital) · tenant: Nscale
- Microsoft Catawba County Campuses (Conover, Hickory, Maiden, Newton), Conover · under construction · developer: Microsoft · ~$1.0B
- AWS North Carolina Campus — 1.0 GW, Richmond County · under construction · developer: AWS
- Digital Realty Charlotte Moores Chapel Campus — 400 MW, Charlotte · under construction · developer: Digital Realty
- PowerHouse Charlotte (University City Boulevard) — 380 MW, Charlotte · under construction · developer: PowerHouse Data Centers
- Edged Energy Long Ferry Road Campus (CLT01), Salisbury · under construction · developer: Edged Energy (EDC Charlotte LLC)
- Lenoir Expansion, Lenoir · announced · developer: Google · ~$1.0B
- PointOne / CyrusOne Sanford Campus (Lower Moncure Road) — 90 MW, Sanford · announced · developer: PointOne Data Centers · tenant: CyrusOne · ~$0.9B
- Project Delta (Walnut Cove / Belews Creek) — 2.0 GW, Walnut Cove · announced · developer: Engineered Land Solutions
- WhiteFiber NC-2 / NC-3 Yadkinville Campuses — 200 MW, Yadkinville · announced · developer: WhiteFiber (Bit Digital)
- Microsoft Person County Mega Park Campus, Roxboro · announced · developer: Microsoft
- Compass Datacenters Statesville (Stamey Farm Road), Statesville · permitted · developer: Compass Datacenters
Frequently asked questions
- How many data centers are in North Carolina?
- Data Center Index tracks 15 named data center campuses in North Carolina as of 2026: 4 operating, 5 under construction, and 6 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does North Carolina have?
- 691 MW is operating, with 4.1 GW in the announced and under-construction pipeline. 8 of the 10 North Carolina campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in North Carolina?
- Project Delta (Walnut Cove / Belews Creek) in Walnut Cove is the largest tracked campus in North Carolina at 2.0 GW, developed by Engineered Land Solutions. That capacity is an estimate, not a figure a named source states.
- Who is building data centers in North Carolina?
- The most active developers in North Carolina by tracked campus count are WhiteFiber (Bit Digital) (2 campuses), Microsoft (2 campuses), Core Scientific (1 campus). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves North Carolina data centers?
- Duke Energy runs the grid and the interconnection queue for North Carolina, so new campus power requests are approved on its timeline.
Public companies exposed to North Carolina
These public companies have tracked data-center projects in North Carolina as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Amazon (AMZN) — hyperscaler · 1 project in North Carolina
- CoreWeave (CRWV) — gpu cloud · 1 project in North Carolina
- Alphabet (GOOGL) — hyperscaler · 1 project in North Carolina
- Meta Platforms (META) — hyperscaler · 1 project in North Carolina
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects