North Carolina Data Centers
Live tracking of every data center project in North Carolina (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 4
- Under construction: 3
- Announced: 9
- Operating capacity: 665 MW
- Pipeline capacity: 2.3 GW
- Grid: Duke Energy
North Carolina's largest build is AWS's campus under construction in Richmond County. In Charlotte, Digital Realty on Moores Chapel Road and PowerHouse on University City Boulevard are both building, while Apple in Maiden, Meta in Forest City and WhiteFiber's 200 MW NC-1 in Madison are already operating. Microsoft has announced a campus in Person County.
Data Center Index tracks 16 named data center campuses in North Carolina (large sites with a source, not every building): 4 operating, 3 under construction, and 9 announced or permitted. The pipeline adds up to 2.3 GW of planned capacity. The grid is operated by Duke Energy, which runs the interconnection queue. Below: every tracked project in North Carolina, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in North Carolina
- CoreWeave Marble NC, 65 MW, Marble · operational · developer: Core Scientific · tenant: CoreWeave · ~$2.5B
- Apple Maiden Data Center, 200 MW, Maiden · operational · developer: Apple
- Meta Forest City, North Carolina AI Data Center Campus, 200 MW, Forest City · operational · developer: Meta
- WhiteFiber NC-1 Madison AI Data Center Campus, 200 MW, Madison · operational · developer: WhiteFiber (Bit Digital) · tenant: Nscale
- AWS North Carolina Campus, 1 GW, Richmond County · under construction · developer: Amazon Web Services · ~$10B
- Microsoft Catawba County Campuses (Conover, Hickory, Maiden, Newton), Conover · under construction · developer: Microsoft · ~$1B
- Digital Realty Charlotte Moores Chapel Campus, 400 MW, Charlotte · under construction · developer: Digital Realty
- PowerHouse Charlotte (University City Boulevard), 380 MW, Charlotte · under construction · developer: PowerHouse Data Centers
- Lenoir Expansion, Lenoir · announced · developer: Google · ~$1B
- PointOne / CyrusOne Sanford Campus (Lower Moncure Road), 90 MW, Sanford · announced · developer: PointOne Data Centers · tenant: CyrusOne · ~$0.9B
- Microsoft Person County Mega Park Campus, Roxboro · announced · developer: Microsoft
- WhiteFiber Yadkinville Warehouse Campus, Yadkinville · announced · developer: WhiteFiber (Bit Digital)
- WhiteFiber Yadkinville Manufacturing Campus, Yadkinville · announced · developer: WhiteFiber (Bit Digital)
- Terra Nexus Old Cheraw Highway Data Center, 460 MW, Rockingham · permitted · developer: Terra Nexus · ~$1.2B
- Compass Datacenters Statesville (Stamey Farm Road), Statesville · permitted · developer: Compass Datacenters
- Project Delta (Walnut Cove / Belews Creek), Walnut Cove · permitted · developer: Engineered Land Solutions
- Edged Long Ferry Road Data Center, Salisbury · permitted · developer: Edged Energy
Frequently asked questions
- How many data centers are in North Carolina?
- Data Center Index tracks 16 named data center campuses in North Carolina as of 2026: 4 operating, 3 under construction, and 9 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does North Carolina have?
- 665 MW is operating, with 2.3 GW in the announced and under-construction pipeline. Of the 9 North Carolina campuses with a capacity figure, 0 are filed, 4 stated and 5 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in North Carolina?
- AWS North Carolina Campus in Richmond County is the largest tracked campus in North Carolina at 1 GW, developed by Amazon Web Services. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building data centers in North Carolina?
- The most active developers in North Carolina by tracked campus count are WhiteFiber (Bit Digital) (3 campuses), Microsoft (2 campuses), Core Scientific (1 campus). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves North Carolina data centers?
- Duke Energy runs the grid and the interconnection queue for North Carolina, so new campus power requests are approved on its timeline.
Public companies exposed to North Carolina
These public companies have tracked data-center projects in North Carolina as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Amazon (AMZN), hyperscaler · 1 project in North Carolina
- CoreWeave (CRWV), gpu cloud · 1 project in North Carolina
- Alphabet (GOOGL), hyperscaler · 1 project in North Carolina
- Meta Platforms (META), hyperscaler · 1 project in North Carolina
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 107 tracked projects, 41.4 GW pipeline
- Utah data centers, 14 tracked projects, 14.3 GW pipeline
- Virginia data centers, 94 tracked projects, 13.6 GW pipeline
- Ohio data centers, 48 tracked projects, 13.2 GW pipeline
- Georgia data centers, 47 tracked projects, 9.9 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Pennsylvania data centers, 26 tracked projects, 7.1 GW pipeline
- Kansas data centers, 11 tracked projects, 6.7 GW pipeline
- Illinois data centers, 15 tracked projects, 6.2 GW pipeline
- Florida data centers, 7 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.1 GW pipeline
- Oklahoma data centers, 13 tracked projects, 4.5 GW pipeline
- Missouri data centers, 10 tracked projects, 4 GW pipeline
- Arizona data centers, 31 tracked projects, 3.9 GW pipeline
- Alabama data centers, 10 tracked projects, 3.8 GW pipeline
- Nevada data centers, 16 tracked projects, 3.4 GW pipeline
- Maryland data centers, 6 tracked projects, 3.2 GW pipeline
- West Virginia data centers, 9 tracked projects, 2.9 GW pipeline
- Arkansas data centers, 8 tracked projects, 2.7 GW pipeline
- North Dakota data centers, 14 tracked projects, 2.2 GW pipeline
- Michigan data centers, 11 tracked projects, 2.2 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 22 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- Iowa data centers, 22 tracked projects, 1.4 GW pipeline
- New York data centers, 9 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New Mexico data centers, 3 tracked projects, 1.3 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 8 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 5 tracked projects, 840 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- Mississippi data centers, 10 tracked projects, 500 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Minnesota data centers, 6 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- Washington data centers, 5 tracked projects