CoreWeave Marble NC
65 MW AI data center in Marble, NC, United States: operational.
Updated
- Capacity: 65 MW
- Location: Marble, NC, United States
- Developer: Core Scientific
- Tenant: CoreWeave
- Status: operational
- Estimated cost: $2.5B
CoreWeave Marble NC is a 65 MW AI data center project located in Marble, NC, United States, currently operational. It was developed by Core Scientific for tenant CoreWeave. The estimated build cost is $2.5B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in North Carolina.
Notes
Users: OpenAI; Epoch 'Current power' = 65 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to CoreWeave Marble NC
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- CoreWeave (CRWV), developer · gpu cloud · high DC exposure
- Core Scientific (CORZ), developer · dc operator
- CoreWeave (CRWV), tenant · gpu cloud · high DC exposure
- OpenAI (OPENAI), tenant · ai lab
Related data center projects
- Core Scientific Muskogee, 1 GW, Muskogee, OK, United States · operational
- Core Scientific Pecos AI Campus, 1 GW, Reeves County, TX, United States · operational
- Core Scientific Denton, 260 MW, Denton, TX, United States · operational
- Core Scientific Calvert City Campus Calvert City, 150 MW, Calvert City, KY, United States · operational
- Core Scientific Dalton 3 Dalton, 142 MW, Dalton, GA, United States · operational
- Core Scientific Grand Forks, 100 MW, Grand Forks, ND, United States · operational
- CoreWeave Dalton 1 & 2, 50 MW, Dalton, GA, United States · operational
- Core Scientific Auburn 1 Auburn, 50 MW, Auburn, AL, United States · operational
Frequently asked questions
- What is CoreWeave Marble NC?
- CoreWeave Marble NC is an AI data center project in Marble, North Carolina tracked by Data Center Index. Its status is operational.
- Where is CoreWeave Marble NC?
- CoreWeave Marble NC is in Marble, North Carolina. Every tracked North Carolina campus, with counts and capacity, is at https://datacenterindex.ai/markets/north-carolina.
- How big is CoreWeave Marble NC?
- Data Center Index tracks CoreWeave Marble NC at 65 MW, on an estimated $2.5B build. The developer or the press states that capacity, in a source dated May 12, 2026.
- Who is building CoreWeave Marble NC?
- Core Scientific is developing CoreWeave Marble NC, with CoreWeave named as the tenant.
- Which public companies are linked to CoreWeave Marble NC?
- Data Center Index links 4 tracked public companies to CoreWeave Marble NC: CoreWeave (CRWV), Core Scientific (CORZ), CoreWeave (CRWV), OpenAI (OPENAI). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Investing.com (Core Scientific Q1 2026 slides) (investing.com · press · 2026-05-12)
- CoreWeave Marble NC | AI Data Centers (epoch.ai · aggregator · 2026-09-11)
- Core Scientific (Q1 2026 prepared remarks) (d1io3yog0oux5.cloudfront.net · press · 2026-05-06)
- WHQR / BPR (whqr.org · press · 2026-10-07)