Core Scientific Dalton 3 Dalton
142 MW AI data center in Dalton, GA, United States: operational.
Updated
- Capacity: 142 MW
- Location: Dalton, GA, United States
- Developer: Core Scientific
- Status: operational
Core Scientific Dalton 3 Dalton is a 142 MW AI data center project located in Dalton, GA, United States, currently operational. It was developed by Core Scientific. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Georgia.
Project description
Core Scientific's facility page gives the address as 206 Boring Dr, Dalton, GA 30721 and lists a total power capacity of 142 MW on 12 acres. The company's 10-Q for the quarter ended 2026-09-30 counts this site among its operating facilities.
Public companies linked to Core Scientific Dalton 3 Dalton
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Core Scientific (CORZ), developer · dc operator
Related data center projects
- Core Scientific Muskogee, 1 GW, Muskogee, OK, United States · operational
- Core Scientific Pecos AI Campus, 1 GW, Reeves County, TX, United States · operational
- Core Scientific Denton, 260 MW, Denton, TX, United States · operational
- Core Scientific Calvert City Campus Calvert City, 150 MW, Calvert City, KY, United States · operational
- Core Scientific Grand Forks, 100 MW, Grand Forks, ND, United States · operational
- CoreWeave Marble NC, 65 MW, Marble, NC, United States · operational
- CoreWeave Dalton 1 & 2, 50 MW, Dalton, GA, United States · operational
- Core Scientific Auburn 1 Auburn, 50 MW, Auburn, AL, United States · operational
Frequently asked questions
- What is Core Scientific Dalton 3 Dalton?
- Core Scientific Dalton 3 Dalton is an AI data center project in Dalton, Georgia tracked by Data Center Index. Its status is operational.
- Where is Core Scientific Dalton 3 Dalton?
- Core Scientific Dalton 3 Dalton is in Dalton, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is Core Scientific Dalton 3 Dalton?
- Data Center Index tracks Core Scientific Dalton 3 Dalton at 142 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
- Who is building Core Scientific Dalton 3 Dalton?
- Core Scientific is developing Core Scientific Dalton 3 Dalton.
- Which public companies are linked to Core Scientific Dalton 3 Dalton?
- Data Center Index links 1 tracked public company to Core Scientific Dalton 3 Dalton: Core Scientific (CORZ). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Dalton 3 data center (corescientific.com · press · 2026-11-18)
- Core Scientific (Form 10-Q for the quarter ended 2026-09-30, filed (sec.gov · filing · 2026-11-18)