Core Scientific (CORZ)

Bitcoin miner and data center operator converting its sites to high-density colocation for AI workloads. Shareholders voted down CoreWeave's all-stock takeover in October 2025, so it remains independent.

Projects

Frequently asked questions

How many data centers does Core Scientific have?
Data Center Index tracks 6 data center campuses with Core Scientific named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Core Scientific have?
2.5 GW across 6 tracked campuses, counting operating and pipeline sites together. Of the 6 Core Scientific campuses with a capacity figure, 1 is filed, 3 stated and 2 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Core Scientific build data centers?
Tracked Core Scientific campuses sit in 5 markets: TX (2), GA (1), NC (1), ND (1), OK (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Core Scientific data center?
Core Scientific Muskogee in OK is the largest tracked Core Scientific campus at 1 GW, currently operational. The developer or the press states that capacity, in a source dated August 14, 2026.

Profile sources