CoreWeave Dalton 1 & 2
28 MW AI data center in Dalton, GA, United States: operational.
- Capacity: 28 MW
- Location: Dalton, GA, United States
- Developer: Core Scientific
- Tenant: CoreWeave
- Status: operational
- Estimated cost: $1.1B
CoreWeave Dalton 1 & 2 is a 28 MW AI data center project located in Dalton, GA, United States, currently operational. It is being built by Core Scientific for tenant CoreWeave. The estimated build cost is $1.1B. This project is one of thousands of data-center facilities tracked by Data Center Index across GA, United States, covering operational, under-construction, announced, and permitted sites.
Notes
Users: OpenAI; Epoch 'Current power' = 28 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to CoreWeave Dalton 1 & 2
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- CoreWeave (CRWV), developer · gpu cloud · high DC exposure
Related data center projects
- CoreWeave Muskogee OK, 1 GW, Muskogee, OK, United States · operational
- Core Scientific Pecos AI Campus, 1 GW, Pecos, TX, United States · under construction
- CoreWeave Denton TX, 260 MW, Denton, TX, United States · operational
- CoreWeave Marble NC, 65 MW, Marble, NC, United States · operational
- Stratos Hyperscale Data Center, 9 GW, Hansel Valley, UT, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
Frequently asked questions
- What is CoreWeave Dalton 1 & 2?
- CoreWeave Dalton 1 & 2 is an AI data center project in Dalton, Georgia tracked by Data Center Index. Its status is operational.
- Where is CoreWeave Dalton 1 & 2?
- CoreWeave Dalton 1 & 2 is in Dalton, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is CoreWeave Dalton 1 & 2?
- Data Center Index tracks CoreWeave Dalton 1 & 2 at 28 MW, on an estimated $1.1B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building CoreWeave Dalton 1 & 2?
- Core Scientific is developing CoreWeave Dalton 1 & 2, with CoreWeave named as the tenant.
- Which public companies are linked to CoreWeave Dalton 1 & 2?
- Data Center Index links 1 tracked public company to CoreWeave Dalton 1 & 2: CoreWeave (CRWV). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Dalton Daily Citizen (daltoncitizen.com · press · 2026-05-30)
- CoreWeave Dalton 1 & 2 | AI Data Centers (epoch.ai · aggregator · 2026-09-11)
- Core Scientific (corescientific.com · press · 2025-03-24)