Edged Energy
Tracked AI data center portfolio for Edged Energy: live capex history, supplier exposure, and project map.
- Projects tracked: 3
- Total pipeline: 725 MW
Projects
- Project Atlas (South Whitehall), 725 MW, South Whitehall Township, PA, United States · announced
- Edged DeKalb (Project Vector), DeKalb, IL, United States · permitted
- Edged Long Ferry Road Data Center, Salisbury, NC, United States · permitted
Frequently asked questions
- How many data centers does Edged Energy have?
- Data Center Index tracks 3 data center campuses with Edged Energy named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Edged Energy have?
- 725 MW across 3 tracked campuses, counting operating and pipeline sites together. Of the 1 Edged Energy campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Edged Energy build data centers?
- Tracked Edged Energy campuses sit in 3 markets: IL (1), NC (1), PA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Edged Energy data center?
- Project Atlas (South Whitehall) in South Whitehall Township, PA is the largest tracked Edged Energy campus at 725 MW, currently announced. The developer or the press states that capacity, in a source dated July 8, 2026.