Edged Energy Long Ferry Road Campus (CLT01)
AI data center in Salisbury, NC, United States — under construction.
- Location: Salisbury, NC, United States
- Developer: Edged Energy (EDC Charlotte LLC)
- Status: under construction
Edged Energy Long Ferry Road Campus (CLT01) is a AI data center project located in Salisbury, NC, United States, currently under construction. It is being built by Edged Energy (EDC Charlotte LLC). This project is one of thousands of data-center facilities tracked by Data Center Index across NC, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Edged (EDC Charlotte LLC) bought Long Ferry Road parcels off I-85 about a mile from Duke's Buck Creek station (land sold for ~$173M) and has land clearing and substation installation under way with no end user signed; county correspondence cites peak water demand requests of 3.4M then 5.7M gallons/day. No MW stated.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted