Idaho Data Centers
Live tracking of every data center project in Idaho — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 1
- Under construction: 0
- Announced: 2
- Operating capacity: 200 MW
- Pipeline capacity: 350 MW
Idaho has one operating campus, Meta's $5.8B, 198 MW site in Kuna, plus two projects that show where the state is heading: Micron's fab expansion under construction in Boise and Oklo's 50 MW Aurora nuclear powerhouse announced at Arco.
Data Center Index tracks 3 named data center campuses in Idaho (large sites with a source, not every building): 1 operating, 0 under construction, and 2 announced or permitted. The pipeline adds up to 350 MW of planned capacity. Below: every tracked project in Idaho, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Idaho
- Meta Kuna — 200 MW, Kuna ID 83634 · operational · developer: Meta · ~$5.8B
- Boise Fab Expansion, Boise · under construction · developer: Micron
- TerraVolt Southeast Idaho Campus (Raft River) — 240 MW, Raft River · announced · developer: TerraVolt Infrastructure (CalEthos)
- Deep Atomic INL Nuclear-Powered AI Data Center — 60 MW, Idaho Falls · announced · developer: Deep Atomic
- Oklo's Aurora Nuclear Powerhouse for AI Data Centers — 50 MW, Arco · announced · developer: Oklo Inc.
- Gemstone Technology Park, Kuna · permitted · developer: Diode Ventures · ~$1.0B
Frequently asked questions
- How many data centers are in Idaho?
- Data Center Index tracks 3 named data center campuses in Idaho as of 2026: 1 operating, 0 under construction, and 2 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Idaho have?
- 200 MW is operating, with 350 MW in the announced and under-construction pipeline. 3 of the 4 Idaho campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in Idaho?
- TerraVolt Southeast Idaho Campus (Raft River) in Raft River is the largest tracked campus in Idaho at 240 MW, developed by TerraVolt Infrastructure (CalEthos). That capacity is an estimate, not a figure a named source states.
- Who is building data centers in Idaho?
- Developers with a tracked campus in Idaho include Meta, Micron, TerraVolt Infrastructure (CalEthos). Every campus page lists its developer, tenant and the source that names them.
Public companies exposed to Idaho
These public companies have tracked data-center projects in Idaho as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Meta Platforms (META) — hyperscaler · 1 project in Idaho
- Micron Technology (MU) — chip fab · 1 project in Idaho
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- Oregon data centers — 13 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects