Alabama Data Centers
Live tracking of every data center project in Alabama (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 2
- Operating and expanding: 1
- Under construction: 3
- Announced: 4
- Operating capacity: 146 MW
- Pipeline capacity: 3.4 GW
Meta operates in Huntsville and is building in Montgomery, and the rest of Alabama's pipeline has filled in around Birmingham. Nebius is building a 300 MW AI factory in Oxmoor Valley, QTS's Project Marvel in Bessemer is permitted, and Applied Digital has a 210 MW campus permitted in Brookwood. Google runs a data center in Jackson County, and Cloverleaf has announced Project Red Clay in Hayneville.
Data Center Index tracks 9 named data center campuses in Alabama (large sites with a source, not every building): 2 operating, 3 under construction, and 4 announced or permitted. The pipeline adds up to 3.4 GW of planned capacity. Below: every tracked project in Alabama, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Alabama
- Meta Huntsville, 146 MW, Huntsville · operational · developer: Meta · ~$1.5B
- Google Jackson County Data Center, Bridgeport · operational · developer: Google · ~$1.5B
- Meta Montgomery, 153 MW, Montgomery · under construction · developer: Meta · ~$1.5B
- Nebius BHM01 (Oxmoor Valley AI Factory), 300 MW, Birmingham · under construction · developer: Nebius
- Digi Power X Columbiana AI Campus, 40 MW, Columbiana · under construction · developer: Digi Power X · tenant: Cerebras Systems
- Calvert Infrastructure Hub, Calvert · announced · developer: Beacon Data Centers · ~$6B
- Project Red Clay, 1.5 GW, Hayneville · announced · developer: Cloverleaf Infrastructure · ~$1.5B
- Project Marvel (QTS Bessemer), 1.2 GW, Bessemer · permitted · developer: QTS Data Centers · ~$14.5B
- Applied Digital Brookwood, 210 MW, Brookwood · permitted · developer: Applied Digital
Frequently asked questions
- How many data centers are in Alabama?
- Data Center Index tracks 9 named data center campuses in Alabama as of 2026: 2 operating, 3 under construction, and 4 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Alabama have?
- 146 MW is operating, with 3.4 GW in the announced and under-construction pipeline. Of the 7 Alabama campuses with a capacity figure, 1 is filed, 2 stated and 4 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in Alabama?
- Project Red Clay in Hayneville is the largest tracked campus in Alabama at 1.5 GW, developed by Cloverleaf Infrastructure. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building data centers in Alabama?
- The most active developers in Alabama by tracked campus count are Meta (2 campuses), Google (1 campus), Nebius (1 campus). Every campus page lists its developer, tenant and the source that names them.
Public companies exposed to Alabama
These public companies have tracked data-center projects in Alabama as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Meta Platforms (META), hyperscaler · 2 projects in Alabama
- NextEra Energy (NEE), energy · 1 project in Alabama
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 107 tracked projects, 45.8 GW pipeline
- Utah data centers, 8 tracked projects, 15.6 GW pipeline
- Virginia data centers, 94 tracked projects, 14.4 GW pipeline
- Ohio data centers, 36 tracked projects, 12.2 GW pipeline
- Georgia data centers, 44 tracked projects, 10.4 GW pipeline
- Pennsylvania data centers, 17 tracked projects, 9.2 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Kansas data centers, 10 tracked projects, 6.5 GW pipeline
- Illinois data centers, 15 tracked projects, 6.2 GW pipeline
- Florida data centers, 6 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.2 GW pipeline
- West Virginia data centers, 8 tracked projects, 4.9 GW pipeline
- Oklahoma data centers, 12 tracked projects, 4.5 GW pipeline
- Arizona data centers, 27 tracked projects, 3.7 GW pipeline
- Maryland data centers, 6 tracked projects, 3.2 GW pipeline
- Missouri data centers, 8 tracked projects, 3.2 GW pipeline
- Michigan data centers, 11 tracked projects, 2.5 GW pipeline
- Arkansas data centers, 7 tracked projects, 2.5 GW pipeline
- North Carolina data centers, 16 tracked projects, 2.3 GW pipeline
- Nevada data centers, 12 tracked projects, 1.8 GW pipeline
- North Dakota data centers, 6 tracked projects, 1.7 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 12 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New York data centers, 4 tracked projects, 1.2 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 5 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 4 tracked projects, 840 MW pipeline
- Mississippi data centers, 7 tracked projects, 728 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Iowa data centers, 8 tracked projects, 261 MW pipeline
- Minnesota data centers, 5 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- New Mexico data centers, 2 tracked projects
- Washington data centers, 5 tracked projects