Digi Power X
Tracked AI data center portfolio for Digi Power X: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 40 MW
Projects
- Digi Power X Columbiana AI Campus, 40 MW, Columbiana, AL, United States · under construction
Frequently asked questions
- How many data centers does Digi Power X have?
- Data Center Index tracks 1 data center campus with Digi Power X named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Digi Power X have?
- 40 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Digi Power X campus with a capacity figure, 1 is filed, 0 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Digi Power X build data centers?
- Tracked Digi Power X campuses sit in 1 market: AL (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Digi Power X data center?
- Digi Power X Columbiana AI Campus in AL is the largest tracked Digi Power X campus at 40 MW, currently under construction. A permit, utility filing or SEC filing states that capacity, in a source dated May 5, 2026.