Digi Power X Columbiana AI Campus
40 MW AI data center in Columbiana, AL, United States: under construction.
- Capacity: 40 MW
- Location: Columbiana, AL, United States
- Developer: Digi Power X
- Tenant: Cerebras Systems
- Status: under construction
Digi Power X Columbiana AI Campus is a 40 MW AI data center project located in Columbiana, AL, United States, currently under construction. It is being built by Digi Power X for tenant Cerebras Systems. This project is one of thousands of data-center facilities tracked by Data Center Index across AL, United States, covering operational, under-construction, announced, and permitted sites.
Project description
In Columbiana, crews are putting up the building shell and construction of the purpose-built AI data center campus remains on schedule. Phase 1 is on track to be ready for service in December 2026 and Phase 2 by the end of fiscal Q1 2027. Cerebras Systems has a 10-year, $1.1 billion colocation agreement for 40 MW, and roughly $95 million had been deployed into the Alabama site year-to-date.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, Arcadia, FL, United States · permitted
Frequently asked questions
- What is Digi Power X Columbiana AI Campus?
- Digi Power X Columbiana AI Campus is an AI data center project in Columbiana, Alabama tracked by Data Center Index. Its status is under construction.
- Where is Digi Power X Columbiana AI Campus?
- Digi Power X Columbiana AI Campus is in Columbiana, Alabama. Every tracked Alabama campus, with counts and capacity, is at https://datacenterindex.ai/markets/alabama.
- How big is Digi Power X Columbiana AI Campus?
- Data Center Index tracks Digi Power X Columbiana AI Campus at 40 MW. A permit, utility filing or SEC filing states that capacity, in a source dated May 5, 2026.
- Who is building Digi Power X Columbiana AI Campus?
- Digi Power X is developing Digi Power X Columbiana AI Campus, with Cerebras Systems named as the tenant.
- When will Digi Power X Columbiana AI Campus come online?
- The next building at Digi Power X Columbiana AI Campus is expected online 2026-12. That date is the first building going live, not the full build-out.
Sources
- Digi Power X says AI data center buildout is on track, reports $155 million in cash (finance.yahoo.com · press · 2026-07-07)
- SEC EDGAR (Digi Power X 8-K exhibit 99.1) (sec.gov · filing · 2026-05-05)
- Bham Now (bhamnow.com · press · 2026-10-07)
- Cerebras signs on for 40MW of capacity at Digi Power X data center in Alabama (datacenterdynamics.com · press · 2026-05-06)
- Construction Starts on 40 MW AI Data Center in Columbiana, Alabama After $1.1B Deal (constructionreviewonline.com · press · 2026-05-05)
- Digi Power X Announces $200 Million Debt Financing Commitment to Support Completion of Alabama AI Data Center and Provides Expansion Update (finance.yahoo.com · press · 2026-10-13)
- Digi Power X Form 10-Q (filed (sec.gov · filing · 2026-10-13)