Cerebras Systems
Tracked AI data center portfolio for Cerebras Systems: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 40 MW
Projects
- Digi Power X Columbiana AI Campus, 40 MW, Columbiana, AL, United States · under construction
- Cerebras Systems Condor Galaxy AI Supercomputer, 30 MW, Dallas, TX, United States · operational
Frequently asked questions
- How many data centers does Cerebras Systems have?
- Data Center Index tracks 1 data center campus with Cerebras Systems named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Cerebras Systems have?
- 40 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 2 Cerebras Systems campuses with a capacity figure, 1 is filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Cerebras Systems build data centers?
- Tracked Cerebras Systems campuses sit in 2 markets: AL (1), TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Cerebras Systems data center?
- Digi Power X Columbiana AI Campus in AL is the largest tracked Cerebras Systems campus at 40 MW, currently under construction. A permit, utility filing or SEC filing states that capacity, in a source dated May 5, 2026.