Cerebras Systems

Tracked AI data center portfolio for Cerebras Systems: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does Cerebras Systems have?
Data Center Index tracks 1 data center campus with Cerebras Systems named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Cerebras Systems have?
40 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 2 Cerebras Systems campuses with a capacity figure, 1 is filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Cerebras Systems build data centers?
Tracked Cerebras Systems campuses sit in 2 markets: AL (1), TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Cerebras Systems data center?
Digi Power X Columbiana AI Campus in AL is the largest tracked Cerebras Systems campus at 40 MW, currently under construction. A permit, utility filing or SEC filing states that capacity, in a source dated May 5, 2026.