Connecticut Data Centers

Live tracking of every data center project in Connecticut (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.

Data Center Index tracks 1 named data center campus in Connecticut (large sites with a source, not every building): 0 operating, 0 under construction, and 1 announced or permitted. The pipeline adds up to 100 MW of planned capacity. Below: every tracked project in Connecticut, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.

Tracked data center projects in Connecticut

Frequently asked questions

How many data centers are in Connecticut?
Data Center Index tracks 1 named data center campus in Connecticut as of 2026: 0 operating, 0 under construction, and 1 announced or permitted. Coverage is named campuses with a published source, not every building.
How much data center capacity does Connecticut have?
No operating capacity is published, with 100 MW in the announced and under-construction pipeline. Of the 1 Connecticut campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
What is the largest data center in Connecticut?
Beacon Falls Lopus Road Data Center Campus in Beacon Falls is the largest tracked campus in Connecticut at 100 MW, developed by O&G Industries. The developer or the press states that capacity, in a source dated October 7, 2026.
Who is building data centers in Connecticut?
Developers with a tracked campus in Connecticut include O&G Industries. Every campus page lists its developer, tenant and the source that names them.

Other data center markets

Tracked US markets, ranked by pipeline capacity: