Oregon Data Centers
Live tracking of every data center project in Oregon — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 7
- Operating and expanding: 2
- Under construction: 4
- Announced: 2
- Operating capacity: 1.3 GW
- Pipeline capacity: 2.5 GW
- Grid: BPA
Oregon runs on Bonneville power and a mix of hyperscale and colocation. AWS has a 576 MW expansion under construction in Boardman, Meta occupies a 243 MW QTS campus in Hillsboro where Digital Realty is adding 150 MW, Google operates 185 MW in The Dalles, and Apple runs 120 MW in Prineville.
Data Center Index tracks 13 named data center campuses in Oregon (large sites with a source, not every building): 7 operating, 4 under construction, and 2 announced or permitted. The pipeline adds up to 2.5 GW of planned capacity. The grid is operated by BPA, which runs the interconnection queue. Below: every tracked project in Oregon, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Oregon
- Meta-QTS Hillsboro 2 — 243 MW, Hillsboro · operational · developer: QTS Data Centers · tenant: Meta · ~$6.8B
- Google The Dalles — 185 MW, The Dalles · operational · developer: Google · ~$5.8B
- Meta Prineville Data Center, Prineville · operational · developer: Meta · ~$2.0B
- NTT Hillsboro Campus (HI1-HI2 + expansion) — 354 MW, Hillsboro · operational · developer: NTT Global Data Centers
- STACK POR03 Hillsboro Campus — 200 MW, Hillsboro · operational · developer: STACK Infrastructure
- Hillsboro Campus — 150 MW, Hillsboro · operational · developer: Digital Realty
- Apple — Prineville, Oregon Data Center — 120 MW, Prineville · operational · developer: Apple
- AWS Oregon Expansion — 1.0 GW, Boardman · under construction · developer: AWS
- Sabey SDC Umatilla — 150 MW, Umatilla · under construction · developer: Sabey Data Centers
- Aligned Hillsboro Campus (PDX-01) — 108 MW, Hillsboro · under construction · developer: Aligned Data Centers
- Crane PDX01 (Forest Grove) — 100 MW, Forest Grove · under construction · developer: Crane Data Centers
- AWS Boardman Exascale Campus (Threemile Canyon) — 1.0 GW, Boardman · announced · developer: Amazon Web Services · ~$12.0B
- QTS Hillsboro 3 (HIL3) — 100 MW, Hillsboro · permitted · developer: QTS Data Centers
Frequently asked questions
- How many data centers are in Oregon?
- Data Center Index tracks 13 named data center campuses in Oregon as of 2026: 7 operating, 4 under construction, and 2 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Oregon have?
- 1.3 GW is operating, with 2.5 GW in the announced and under-construction pipeline. 7 of the 12 Oregon campuses carrying a capacity figure show an estimate rather than a figure a named source states, marked "est." on the site.
- What is the largest data center in Oregon?
- AWS Oregon Expansion in Boardman is the largest tracked campus in Oregon at 1.0 GW, developed by AWS. That capacity is stated by a named source.
- Who is building data centers in Oregon?
- The most active developers in Oregon by tracked campus count are QTS Data Centers (2 campuses), Google (1 campus), Meta (1 campus). Every campus page lists its developer, tenant and the source that names them.
- Which grid operator serves Oregon data centers?
- BPA runs the grid and the interconnection queue for Oregon, so new campus power requests are approved on its timeline.
Public companies exposed to Oregon
These public companies have tracked data-center projects in Oregon as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Amazon (AMZN) — hyperscaler · 1 project in Oregon
- Digital Realty (DLR) — dc operator · 1 project in Oregon
- Alphabet (GOOGL) — hyperscaler · 1 project in Oregon
- Meta Platforms (META) — hyperscaler · 1 project in Oregon
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers — 55 tracked projects, 63.3 GW pipeline
- Utah data centers — 7 tracked projects, 21.1 GW pipeline
- Pennsylvania data centers — 16 tracked projects, 15.7 GW pipeline
- Ohio data centers — 25 tracked projects, 13.3 GW pipeline
- Virginia data centers — 34 tracked projects, 9.8 GW pipeline
- Kentucky data centers — 8 tracked projects, 8.9 GW pipeline
- Georgia data centers — 26 tracked projects, 8.1 GW pipeline
- Wyoming data centers — 7 tracked projects, 6.1 GW pipeline
- West Virginia data centers — 4 tracked projects, 6.1 GW pipeline
- Florida data centers — 7 tracked projects, 5.9 GW pipeline
- Illinois data centers — 13 tracked projects, 5.5 GW pipeline
- Maryland data centers — 8 tracked projects, 5.3 GW pipeline
- Indiana data centers — 11 tracked projects, 5.0 GW pipeline
- Kansas data centers — 10 tracked projects, 4.5 GW pipeline
- Arizona data centers — 24 tracked projects, 4.4 GW pipeline
- Oklahoma data centers — 12 tracked projects, 4.2 GW pipeline
- North Carolina data centers — 15 tracked projects, 4.1 GW pipeline
- Alabama data centers — 9 tracked projects, 3.4 GW pipeline
- Nebraska data centers — 7 tracked projects, 3.1 GW pipeline
- Louisiana data centers — 8 tracked projects, 3.0 GW pipeline
- Michigan data centers — 9 tracked projects, 2.6 GW pipeline
- Arkansas data centers — 7 tracked projects, 2.5 GW pipeline
- New York data centers — 7 tracked projects, 2.3 GW pipeline
- South Carolina data centers — 8 tracked projects, 1.9 GW pipeline
- Missouri data centers — 6 tracked projects, 1.7 GW pipeline
- Nevada data centers — 10 tracked projects, 1.6 GW pipeline
- Wisconsin data centers — 4 tracked projects, 1.5 GW pipeline
- California data centers — 15 tracked projects, 1.4 GW pipeline
- North Dakota data centers — 4 tracked projects, 1.4 GW pipeline
- Iowa data centers — 8 tracked projects, 1.4 GW pipeline
- Delaware data centers — 1 tracked project, 1.2 GW pipeline
- Montana data centers — 2 tracked projects, 1.1 GW pipeline
- Washington data centers — 5 tracked projects, 1.0 GW pipeline
- Colorado data centers — 4 tracked projects, 800 MW pipeline
- Mississippi data centers — 7 tracked projects, 616 MW pipeline
- Minnesota data centers — 4 tracked projects, 600 MW pipeline
- New Jersey data centers — 3 tracked projects, 550 MW pipeline
- South Dakota data centers — 2 tracked projects, 500 MW pipeline
- Massachusetts data centers — 1 tracked project, 274 MW pipeline
- Idaho data centers — 3 tracked projects, 240 MW pipeline
- Tennessee data centers — 7 tracked projects, 110 MW pipeline
- Connecticut data centers — 1 tracked project, 100 MW pipeline
- New Mexico data centers — 2 tracked projects